BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work and paving for a mixed-use development in Evergreen Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City/County Evergreen Park HMA surface removal; curb & gutter removal & replacement; HMA & PCC driveway pavement removal & replacement; pavement patching; HMA leveling binder & surface course installation; pavement markings; drainage structure adjustment & replacement; topsoil & sod parkway restoration. Project Location: North of 95th St., South of 91st St., West of Kedzie Ave. up to and including Central Park Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - HMA Surface Removal; Curb & Gutter Removal & Replacement; HMA & Pcc Driveway Pavement Removal This work shall consist of the adjustment and repair of existing damaged domestic water service boxes to meet the finish grade of the parkway restoration improvements. This work shall include all labor necessary to accomplish the repair and adjustment. DOMESTIC WATER SERVICE BOXES TO BE ADJUSTED, SPECIAL shall include the materials as needed down to the water shut off valve. Material manufacturer shall be chosen by the owner

Award

Roads / Highways

$4,490,784.00

Public - City

Paving, Site Work

55

5

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
259
Bidding Soon
3,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

June 23, 2025

Project location map

Multiple Locations, Evergreen Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.