BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 21, 2025

Demolition, site work, paving and new construction of a mixed-use development in Orlando, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

District: 08 Call Order: 014 If you have any questions regarding this information, please do not hesitate to contact Rich Nethercote at 407-264-3885. Counties: Orange Road Name: Replace Hempel Avenue Overpass in Orange County (#750387) Limits: 75000011 Project(s): 45208015201(*) Federal Aid No: N/A Project(s): 45208015202 Federal Aid No: N/A Total Roadway Length: 0.094 Miles Total Bridge Length: 0.073 Miles Total Proposal Length: 0.167 Miles Contract Days: 501 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Please read the full advertisement Description: Work consists of providing all labor, materials, equipment and incidentals necessary for milling of SR 408 mainline and shoulder reconstruction from MP 0.168 to MP 0.501. The improvements also include replacement of the Hempel Avenue bridge over SR 408 in Orange County. In addition, there are roadway improvements along Hempel Avenue from Lake Hugh Drive to Saddlebrook Lane. These improvements consist of pavement reconstruction, guardrail, sidewalk, retaining wall and curb ramps. The summary of pay items for this project are listed in the Estimated Quantities Report. No Pre-Bid Conference. Contractor must be prequalified. Question Deadline 05/06/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 014 - Major Bridge - Curved Steel Girders - SR 408

Award

Roads / Highways

$20,930,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

101

9

8

7

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
9
Bidding Soon
1,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

July 29, 2025

Project location map

FL-408, Orlando, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.