Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Site work and paving for a mixed-use development in Apple Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. Question Deadline 04/25/2025 at 10:00 AM CT Direct inquiries to the Project Engineer, Jodie Scheidt, at (952)953-2426 or Jodie.Scheidt@applevalleymn.gov . No bidder questions will be addressed after 10:00 am on Friday, April 25, 2025. Bid Security in the amount of 5 percent of the amount of the Bid must submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. City Project 2025-105 Street Improvements 761 LF Remove Curb and Gutter 560 SF Remove Concrete Walk 1,128 CY Excavation - Common 1,633 TN Aggregate Base Class 5 9,668 SY Full Depth Reclamation 34 EA Adjust Frame & Ring Casting 2,986 TN Bituminous Mixture 24,452 SF 5" Concrete Walk or Driveway 609 LF Concrete Curb and Gutter 1,708 SY Sod Type Lawn 4,335 SY Rapid Stabilization Type 1 With related items Est. Completion Date: Nov. 21, 2025
Award
Roads / Highways
$1,384,396.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2025
May 12, 2025
Multiple Locations, Apple Valley, MN
Related To This Project
Apple Valley, MN
Bid Date: May 06 2025
Apple Valley, MN
--
Apple Valley, MN
Bid Date: May 12 2025
Apple Valley, MN
Bid Date: Jun 03 2025
Apple Valley, MN
Bid Date: Jun 12 2025
Apple Valley, MN
Bid Date: Jun 17 2025
Apple Valley, MN
Bid Date: Jul 15 2025
Apple Valley, MN
Bid Date: Jul 15 2021
Apple Valley, MN
Bid Date: Apr 29 2025
Apple Valley, MN
Bid Date: Apr 23 2025
Apple Valley, MN
Bid Date: Apr 10 2025
Apple Valley, MN
Bid Date: Apr 08 2025
Apple Valley, MN
Bid Date: Apr 02 2025
Apple Valley, MN
Bid Date: Apr 08 2025
Apple Valley, MN
Bid Date: Apr 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.