Published June 22, 2025 at 8:00 PM

Updated June 23, 2025

Site work for a water / sewer project in Honolulu, Hawaii. Completed plans call for site work for a water / sewer project.

Keehi Transfer Station Force Main Replacement Questions relating to this solicitation shall be emailed to Jack Wu at bfspurchasing@honolulu.gov Project Name Keehi Force Main Replacement Project Description Keehi Force Main is a 250-foot 4" diameter sewer force main located under the bike path along North Nimitz Highway. The proposed project involves maintenance of the existing force main that crosses Moanalua Stream. The repair includes removal and a like-to-like replacement of the sewer force main located on the mauka side of a bikeway bridge above water. Off-set air relief valves above the waterway shall also be replaced. HECO Pole 13 adjacent to Kilihau Street will be relocated temporarily or permanently by HECO to facilitate access to the force main and manhole. Ground toning will also be provided to identify existing utilities as much as possible. To facilitate this work, temporary scaffolding will be installed in the water, providing a stable platform for workers to reach the force main. Staging of equipment of materials will be located on the City-owned Keehi Transfer Station property adjacent to the bridge. Grubbing will be required on the stream bank for access to the abutments and access to construct temporary scaffolding. Work plan, materials, and equipment detail below may change based on the methodology developed by the contractor. The footprint of the work area will not change. Work Plan 1. Mobilization 2. Installation of best management practices 3. Grubbing to access the work area. Digging at each end of bridge will be preformed to expose and connect to the existing force main that is underground approximately 1' to 2'. 4. Scaffolding installation 5. Excavation of buried sewer force main 6. Removal of existing sewer force main 7. Installation of new sewer force main 8. Installation of structural steel framing and anchorage for pipe hanger. New concrete work involves pour for a 1'-6"x 2'-0" ARV support that is attached to the bridge located approximately center of the stream, see plan on C-001. 10. Demobilization Materials (all are above-water) o Concrete o Reinforcing steel bars o Epoxy material (See MSDS sheets at the end of Attachment 3) o Stainless steel pipe hangers o Stainless steel pipe support o Stainless steel concrete anchor bolts o Air relief valves o 4" long radius 90 deg elbow o 4" restrained flange coupling adapter o 4" spool o 4" flexible expansion joint o 4" PVC flange van stone o 4" ductile iron pipes o 4" mechanical joint tapped tee with 2" tap o 2" stainless steel elbow o 2" stainless steel companion flange o 2" stainless steel ball valve o 2" ARI D-025 combination air valve o 2" stainless steel nipple Question Deadline 05/14/2025

Bid Results

Water / Sewer

$2,198,131.00

Public - County

Site Work

14

9

26

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
10
Bidding Soon
263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 30, 2025

Project location map

606 Middle St, Honolulu, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.