BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a mixed-use development in Rome, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000383679 The 2025 Parry Street Reconstruction Project consists of a full reconstruction of the existing Parry Street city block located in the City of Rome, NY. Parry Street is located between East Bloomfield Street and Dean Street. The scope of work consists of complete demolition and excavation of the existing roadway, curbing, sidewalks, driveways, gravel, and other features located within the City of Rome Right of Way. Work will be performed to remove and replace existing water and sanitary sewer services to each of the residential homes located along Parry Street. Water service replacements will involve live corporation taps on the existing water main and abandonment of the existing corporations. There is one location along the existing sanitary sewer main which needs to have an approximately 5 Foot length of pipe repair performed. The approximate location of this repair area is at Station 3+00. It should be noted that the sanitary sewer main at this location is at a relatively deep depth of roughly 12 Feet below roadway elevation. Reconstruction of Parry Street will also involve the machine slip forming of concrete curb throughout the entire length of the project. Roadway profile will be constructed as shown on the contract drawings. Concrete sidewalks will be constructed along both East and West sides of Parry Street to service the residential homes and pedestrians in this area. Driveways will be constructed. Tree plantings will be installed as well as sod turf establishment throughout the city block. The contractor will be in control of the Maintenance and Protection of both pedestrian and vehicular traffic along Parry Street during construction. Contractor will also be in control of the Survey and Layout Operations as required to successfully construct the project. This Scope of Work Summary in not an all-inclusive description of the work to be performed but rather a highlevel overview of the major components of the construction project. All work will be performed according to the contract drawings, specifications, and to the satisfaction of the Project Engineer. Question Acceptance Deadline 04/18/2025 04:00 PM EDT Questions are submitted online No

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

12

8

7

4

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
123
Bidding Soon
1,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

Parry St, Rome, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.