Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 7, 2025 at 8:00 PM
Updated June 8, 2025
Site work for a civil project in Seffner, Florida. Completed plans call for site work for a road / highway; and water / sewer project.
District:07 Counties: Hillsborough Road Name: Outfall, Roadside Ditch, & Canal Maintenance Limits: Midpoint Project(s): 41602617288(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Days: 365 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: N/A Please read the full advertisement Description: The work under this Contract consists of the maintenance of outfall / roadside ditches, and canals in Hillsborough County, District 7. The contract will be awarded at the Department's Advertised Project Cost amount of $600,000.00; low bid will set the unit price. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department's estimated quantities and the Contractor's bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. Note the Substituted Commercial General Liability Insurance requirements contained in section(s) 7-13.2 and 7-13.4 of the project Specifications. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank. A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Question Deadline 05/07/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - Call Order: 008 - Outfall, Roadside Ditch, & Canal Maintenance Proposal Budget Estimate: $600,000.00
Award
Roads / Highways
$427,425.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 13, 2025
Multiple Locations, Seffner, FL
Related To This Project
Seffner, FL
Bid Date: Jul 30 2025
Seffner, FL
Bid Date: Aug 15 2025
Seffner, FL
Bid Date: Aug 22 2025
Seffner, FL
Bid Date: Aug 12 2025
Seffner, FL
Bid Date: Oct 08 2025
Seffner, FL
Bid Date: Dec 03 2025
Seffner, FL
Bid Date: May 14 2025
Seffner, FL
Bid Date: May 14 2025
Seffner, FL
Bid Date: May 14 2025
Seffner, FL
Bid Date: May 14 2025
Seffner, FL
Bid Date: May 14 2025
Seffner, FL
Bid Date: May 14 2025
Seffner, FL
Bid Date: Apr 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
