BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Renovation of a day care center in Lincoln, Massachusetts. Completed plans call for the renovation of a day care center.

Project No: MXRD 16-0009, 47PJ0025R0049 The purpose of this project is to selectively renovate the Child Development Center, Building 1994, located on Hanscom Air Force Base. The renovations will provide a solution to the building's various system deficiencies, bring the spaces up to code and FC requirements, and update the finishes that were not previously renovated. The work includes, but is not limited to: Design: Provide comprehensive design services as defined in Section 01 33.00, Design Data. Construction and Construction Management: Construction includes at a minimum all labor, materials, tools, transportation, supervision, administrative requirements, quality control, testing and balancing and adjustment, )&M manuals, closeout documents, as-built, and record drawings to complete the work. Commissioning: Provide commissioning services as defined in Section 01 91 00.15 10, Total Building Commissioning. The contractor shall begin performance within 30 calendar days and complete it within 720 calendar days The estimated construction contract price for the project described in this contract is $Between $10,000,000 and $25,000,000. **PLEASE NOTE RFI Questions are now due by 3pm EST 19 May 2025** QA : Existing exterior building/site lights are to remain Existing Utilities come into the buildings are to remain, all meters are to be replaced per the DBRFP. The Contractor/DoR must submit their own independent 35% after verification of existing condition and comply with Hanscom Design Guidance. All Design drawings and As built drawings must be coordinated drawings must be created in AutoCAD 2018 or later in accordance with current Hanscom Drafting standard A/E/C standard 6.2. All milestones must be identified on the Proposal schedule. The Kitchen is to remain operational during construction. When the kitchen is renovated the equipment should be stored till it is reinstalled. The ACH are in the room schedule. The main entrance door has a card reader access system located near the ABA push button activation device outside of the building. STC ratings for partitions remain the same throughout the day, see drawing in the DPRFP Part 6 Nap time is between 1200-1430 daily. Also, notably infants sleep on demand so in that area there could be sleeping children at any time during operational hours. Contractor/DoR are to provide a phased construction approach to mitigate interruptions to the user and a three week look-ahead for all disruptive construction activities. Mircom is one of the acceptable panels used on base. New FA panel must conform to DPRFP ASHRAE 90.1 2019 is correct. Contractors must comply with the latest UFC 1-200-02 as posted on WBDG and its references including ASHRAE 90.1 2019 with respect to the proposed design and construction effort. All effort is based on Buy American clause. Contractor/DoR must provide their own independent proposals comply with section L and M. No. Contractor is responsible for protection and storage of all items. The contractor will be responsible for any damage to the existing government property. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Day Care Centers

$8,162,500.00

Public - Federal

Renovation

23

17

4

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
586
Active Projects
265
Bidding Soon
4,002
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

August 7, 2025

Project location map

1 Eglin St, Lincoln, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.