BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work and new construction of a pre-engineered storage facility in Broken Arrow, Oklahoma. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The City of Broken Arrow is improving and expanding the infrastructure at Events Park (21101 E 101st St, Broken Arrow, OK 74014). The goal of this project is to construct a new Maintenance Building for the Broken Arrow Events Park. This bid package will include materials, labor and equipment to erect a Pre-engineered metal building. Construction is expected to begin in June 2025. All questions are due by Friday, May 2nd, 2025 at 4:00 PM and should be directed as follows: Trace Drummond at tdrummond@heavycontractors.com

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$141,945.00

Public - City

New Construction, Site Work

20

23

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
99
Bidding Soon
1,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

May 27, 2025

Project location map

21101 E 101st St, Broken Arrow, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.