BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Renovation of an educational facility in Broken Arrow, Oklahoma. Completed plans call for the renovation of a educational facility.

Maintenance Building at 3100 East New Orleans Street, Broken Arrow, OK. 74014. Broken Arrow Campus Roofs (Estimated Project Cost: $150,000) Northeastern State University hereinafter called the Owner, will be accepting sealed bids for project: #B25-16- NSU Broken Arrow Campus Roofs, located on the NSU Broken Arrow Campus. The bid shall be enclosed in a sealed envelope plainly marked and addressed as follows: The name and address of the bidder shall appear in the upper left-hand corner of the envelope. The lower left-hand corner of the envelope shall be marked: BID PACKAGE: #NSU Broken Arrow Campus Roofs. The envelope shall be addressed to: Northeastern State University Attention: Christopher Gay Purchasing Department 600 North Grand Avenue Tahlequah, OK 74464. Contractors are encouraged to bring cameras/measurement tools to take any site measurements necessary. Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on the best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B." Including But Not Limited To: 1) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 2) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. 3) Contractor shall provide NSU with documentation of compliance at completion of work. 4) Contractor to be responsible for all permits and fees associated with this scope of work. 5) Work may be halted and resumed at any given time according to NSU's needs. 6) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 7) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 8) Contractor shall be responsible for coordinating any and all utility locations for the project. 9) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 10) Contractor is responsible for all field verifications of dimensions and conditions. 11) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 12) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 13) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 14) Contractor shall provide restroom facilities for all employees including subs. 15) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 16) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 17) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 18) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 19) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 20) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 21) Contractor shall be responsible for Final Cleaning. This will be to the Owner's discretion. 22) Contractor shall supply accurate "red-line" drawing to Owner prior to final payment. 23) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents. 24) Contractor shall provide Owner training for operations and maintenance of new equipment and systems. Question Deadline 05/05/2025 All questions shall be furnished in writing to: Northeastern State University Attention: Christopher Gay gayc@nsuok.edu Purchasing Department 600 North Grand Avenue Tahlequah, OK 74464

Post-Bid

Educational

$150,000.00

Public - State/Provincial

Renovation

8

3

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
103
Bidding Soon
1,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

3100 New Orleans St, Broken Arrow, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.