BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Site work for a water / sewer project in Carney, Oklahoma. Completed plans call for site work for a water / sewer project.

Engineer's est.: $50,000.00 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing, The Engineer is: Infrastructure Solutions Group, LLC Project Manager: Stephen Frosch, E.I. Daniel Turley, P.E. Address: 500 Village Blvd., Suite A, McAlester OK 74501 Phone Number: (918)420-5500 Email: Stephen.frosch@isgengineering.com Daniel.turley@isgengineering.com SCOPE A. This item shall govern the control measures necessary to prevent and control soil erosion, sedimentation and stormwater pollution which may degrade receiving waters including rivers, streams, lakes, reservoirs, groundwater and wetlands. The control measures contained herein shall be installed and maintained throughout the construction contract and coordinated with the permanent or existing temporary pollution control features specified elsewhere in the Plans and Specifications to assure effective and continuous water pollution control throughout the construction and post construction period. These control measures shall not be used as a substitute for the permanent pollution control measures unless otherwise directed by the Engineer in writing. The controls may include silt fences, sediment filters, dikes, dams, berms, sediment basins, mats, soil retention blankets, temporary seeding, mulch, channel liners, slope drains or other structural or nonstructural water pollution controls.

Bid Results

Water / Sewer

$69,460.00

Public - City

Site Work

9

13

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
68
Bidding Soon
1,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

Project location map

Multiple Locations, Carney, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.