Published June 30, 2025 at 8:00 PM

Updated July 1, 2025

Site work and paving for a road / highway in New Brunswick, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

** As of 06/30/2025 project has been awarded to Schifano Construction Corp. with an awarded amount of $5,726,827.75** 2025 Milling and Paving at Various Locations Questions or requests for information must be submitted in writing as per Section 101.04 and received by: April 25, 2025. The County will not be responsible for verbal answers to bidder's questions. Inquiries received by the Engineer less than 14 calendar days prior to the bid opening date will not be answered. Responses to the questions will be sent in writing by April 29, 2025. Bids must be made on the standard bid proposal form in the manner designated therein and required by the specifications, must be enclosed in sealed envelopes bearing the names of the project and address of the bidder on the outside, addressed to the Board of County Commissioners of Middlesex County, and must be accompanied by a certified check, cashier's check, or bid bond for not less than 10% of the amount bid, but not exceeding $20,000 and be delivered at the place and on the hours above mentioned. The Board reserves the right to reject any and all bids in accordance with applicable law. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. (1975, C. 127), N.J.A.C. 17:27. (An act relating to affirmative action in relation to discrimination in connection with certain public contracts). SCOPE OF WORK 104.01 INTENT 104.02 VALUE ENGINEERING THIS SUBSECTION IS DELETED. 104.03 CHANGES TO THE CONTRACT 104.03.01 Authority to Make Changes THE FIRST SENTENCE OF THE FIRST PARAGRAPH IS DELETED. 1. FIELD ORDERS. THIS SUBHEADING IS DELETED. 2. CHANGE ORDERS. THE SECOND AND THIRD PARAGRAPHS ARE CHANGED TO: The Engineer reserves the right upon the consultation with the Board of County Commissioners to make in writing, at any time during the work, such changes in quantities and such alterations in the work as necessary to satisfactorily complete the project. Such changes in quantities and alterations do not invalidate the Contract nor release the surety, and the Contractor agrees to perform the work as altered. All changes in quantities, work performed, services rendered, materials, supplies or equipment delivered or provided shall be authorized, permitted or accepted by the Board of County Commissioners upon consultation by the County Engineer by the procedures established in N.J.A.C. 5:30-11.3. Notwithstanding the statutory general requirements for change orders, Change orders shall be used to change the number of units or items originally advertised and contracted for, provided that Unit prices or a price methodology were sought in the original specifications and included in the contract and the original specification and the contract included a provision that the unit prices could be so used. Change orders shall not be used to substantially change the quality or character of the items or work to be provided, inasmuch as such would have been a determining factor in the original bidding. The basis for a change in quantities and alteration shall be agreed upon before the performance of the work. If the basis cannot be agreed upon, then an adjustment will be made either for or against the Contractor in such amount the Engineer may determine to be fair and equitable. If the alterations or changes in quantities do not significantly change the character of the Work to be performed under the Contract, the altered work will be paid for as provided elsewhere in the Contract. The term “significant change” shall be construed to apply only to the following circumstances: 1. When the character of the Work as altered differs materially in kind or nature from that involved or included in the original proposed construction, or 104.03.01 Authority to Make Changes (Cont’d) 2. When a major item of work, as defined elsewhere in the Contract, is increased in excess of 120 percent or decreased below 80 percent of the original Contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 120 percent of original Contract item quantity, or in case of a decrease below 80 percent, to the actual amount or work performed. The work to be performed under the contract shall be completed within 180 calendar days.

Award

Roads / Highways

$5,726,827.00

Public - County

Paving, Site Work

4

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
955
Active Projects
431
Bidding Soon
6,550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 13, 2025

Project location map

Multiple Locations, New Brunswick, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.