BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a road / highway in Villa Hills, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Prospect Point Resurfacing Project. The scope of work includes resurfacing, striping, and ADA ramp reconstruction along Prospect Point Drive in Villa Hills, KY as identified in the scope of work. Please be aware that construction activities shall not start prior to July 1, 2025. The City of Villa Hills reserves the right to reject any and all bids, to waive informalities and to negotiate with the apparent qualified best bidder to such an extent as may be in the City s best interest. This contract is considered a Lump Sum Contract. The work to be performed under this invitation for bid and resulting contract (the "Contract") consists of providing all equipment, materials, supplies, tools, and supervision necessary to construct the project as detailed in the Bid Form (the "Project"), and specified herein (the "Work"). The scope of work includes, but is not limited to, the following major items: 1. Provide proposed work schedule to OWNER two weeks prior to work beginning so that OWNER can provide advance notification to residents that will be impacted. 2. Milling existing surface to 1 and 1/2 inches, according to KYTC Standard Specifications for Road and Bridge Construction ("KYTC Standard Specifications") Section 408. 3. Sweeping street surface clear of dust and debris created by milling prior to resurfacing. 4. Milling adjacent to or adjusting manhole and valve box frames to final surface grade prior to resurfacing. To be incorporated with the milling process. Must coordinate with the appropriate utility company. 5. Resurfacing streets to the specified depth, according to KYTC Standard Specifications for Road and Bridge Construction Section 403. Refer to Section 409 for use of Reclaimed Asphalt Pavement. 6. Sealing joints with hot-poured sealant according to KYTC Standard Specifications Section 807. 7. Repaint all Line Striping for Centerline, Crosswalks, and Stop Bars in existing locations, according to KYTC Standard Specifications for Road and Bridge Construction Section 713. 8. Maintenance and control of traffic. See Technical Specification 3 - Maintenance of Traffic. 9. Environmental controls including but not limited to erosion, dust control, cleaning of streets, and surface drainage. 10. Striping and crosswalks must be installed within 30 days of new asphalt being installed. Question Deadline 04/28/2025 at 5:00 PM ET

Award

Roads / Highways

$199,841.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
237
Bidding Soon
2,098
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 30, 2025

Project location map

Prospect Point Dr, Villa Hills, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.