BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work and paving for a mixed-use development in Gardner, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 05, 2025 This project has been awarded to Byrne and Jones Construction, with the awarded amount of $248,245.50.** Description: The City of Gardner is requesting bids for the: "Stone Creek Park (West Side) Trail Replacement". The project includes, but is not limited to, removal of 2354' of existing asphalt trail to be replaced by a 10' concrete trail on an AB-3 base, along with installation of an ADA ramp. Inquiries: Inquiries regarding the project should be directed to: John Trickett, Staff Engineer 913-856-0920 jtrickett@gardnerkansas.gov

Award

Roads / Highways

$248,246.00

Public - City

Paving, Site Work

5

5

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
110
Bidding Soon
1,209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 27, 2025

Project location map

To Be Determined, Gardner, KS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.