Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 24, 2025 at 8:00 PM
Updated April 25, 2025
Site work and new construction of a pre-engineered storage facility in Choctaw, Oklahoma. Conceptual plans call for the construction of a 24,000-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.
The Choctaw-Nicoma Park School District is requesting a design-build team assist in the construction of a new Vo-Ag Show Barn facility The estimated 24,000 SF facility will include a classroom/conference room, concessions area, restroom facilities, show pen with bleachers, queueing pens, wash bays, overhead doors, and site work to accommodate. It is acceptable for these to be spread across more than one building. Included are the furnishing of pens, bleachers, classroom furniture, and food service equipment. The location is remote, requiring consideration for possible utility accommodations. To assist with understanding the program needs, a basic floorplan was created by CWA Group, but design-builder has the flexibility to make changes to accommodate the budget and schedule, and submit as part of their RFQ response. Selection of a Design-Build team will be evaluated on the following criteria: 0 40 points Design-Build teams experience and qualification for construction of school facilities 0-20 points Experience working with school districts 0-20 points Design-Build team's experience working together on projects 0-40 points Proposed design timeline and budget strategy 0-10 points Proof of bonding limits and insurance 0-130 points possible No RFQ may be withdrawn after the scheduled closing time for receipt for a period of at least sixty (60) days. The Owner reserves the right to reject any or all responses. The Owner reserves the right to skip the interview process and award directly upon receipt of qualifications. This project is TAX EXEMPT. Tax exemption designee letters will be provided by the Owner to the DesignBuilder. The warranty period shall initiate following the Owner's Final Acceptance of Work, including approved punch list, closeout documents, owner training, and commissioning.
Project Abandoned
Warehouse / Distribution - Pre-Engineered Storage Building
$3,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2025
January 2, 2026
To Be Determined, Choctaw, OK
Related To This Project
Choctaw, OK
Bid Date: Aug 06 2025
Choctaw, OK
Bid Date: Aug 21 2025
Choctaw, OK
Bid Date: Nov 12 2025
Choctaw, OK
Bid Date: Apr 15 2025
Choctaw, OK
Bid Date: Mar 24 2025
Choctaw, OK
Bid Date: Mar 17 2025
Choctaw, OK
Bid Date: Mar 25 2025
Choctaw, OK
Bid Date: Dec 17 2024
Choctaw, OK
Bid Date: Oct 22 2024
Choctaw, OK
Bid Date: Jun 04 2024
Choctaw, OK
Bid Date: May 01 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
