Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated June 7, 2025
Site work for a mixed-use development in Port Charlotte, Florida. Working plans call for site work for a educational facility.
As of June 6 , 2025 Project has not been awarded , No definite date for rebid Charlotte County Public Schools seeks to contract with a qualified Vendor to providie all labor and materials to prepare areas for sodding, furnishing and placing the sod, watering and rolling in the designated areas, district wide as per specifications, terms and conditions. The intent of the District is to purchase Sod with Installation and rolling on an as required basis. It is the specific purpose of this solicitation to establish a conditional contract for the required materials and service to secure the cost and availability from sources of supply that will give prompt and convenient service. The Contactor must be able to deliver and install quantities as small at 100 square feet to over 10,000 square feet of sod per month. Bidders shall bid unit prices, F.O.B., various site locations within Charlotte County, Florida. The prices bid shall be used for payment and shall include payment in full for all transportation, labor, materials, and equipment used in supplying, delivering, and/or installing said sod. All deliveries shall be made Monday through Friday between the hours of 7:00 a.m. and 3:00 p.m., excluding legal holidays, unless otherwise directed by the Districts Maintenance & Operations representative. Deliveries must be scheduled accordingly and will be held to delivery time. SOD 1) Sod shall be Argentine Bahia, St. Augustine (Floratam), or Empire Zoysia and shall be delivered and installed upon request. 2) Purchases of sod will be made by square feet utilizing five (5) different categories: a) Delivery and installation of sod less than 100 square feet b) Delivery and installation of sod more than 100 square feet but less than 2,400 square feet c) Delivery and installation of sod more than 2,400 square feet but less than 7,200 square feet d) Delivery and installation of sod more than 7,200 square feet e) Pickup and/or delivery of sod by the pallet as determined by the District. Question Deadline Date: April 28, 2025 @ 2:00 p.m.
Final Planning
Educational
$60,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
December 8, 2025
Multiple Locations, Port Charlotte, FL
Related To This Project
Port Charlotte, FL
--
Port Charlotte, FL
--
Port Charlotte, FL
--
Port Charlotte, FL
--
Port Charlotte, FL
--
Port Charlotte, FL
--
Port Charlotte, FL
--
Port Charlotte, FL
Bid Date: Apr 23 2025
Port Charlotte, FL
Bid Date: May 02 2025
Port Charlotte, FL
Bid Date: Apr 25 2025
Port Charlotte, FL
Bid Date: Apr 18 2025
Port Charlotte, FL
--
Port Charlotte, FL
Bid Date: Apr 14 2025
Port Charlotte, FL
Bid Date: Apr 18 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
