BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Demolition and site work for a stadium in Coupland, Texas. Completed plans call for the demolition of a stadium; and for site work for a stadium.

DPS is requesting responses for demolition of buildings, paddock/arena fencing, horse stalls, site cleanup, clear cutting of small trees/shrubs, and creation of main entry road bed with buried conduit for future use located at 12708 Pfluger Berkman Road, Coupland, TX 78615. 4/23/2025 5:00 PM CT Last day to submit written questions for clarification to DPS All work must be completed prior to 6/8/2025. The Texas Department of Public Safety (DPS) is requesting responses for demolition of buildings, paddock/arena fencing, horse stalls, site cleanup, clear cutting of small trees/shrubs, and creation of main entry road bed with buried conduit for future use at the THP equine center located at 12708 Pfluger Berkman Road, Coupland, TX 78615. See summary of work and site plans for additional details. Services to Include: Complete removal (including foundations as applicable) of: o Shed Row Barn, Wooden round pen, feed bunk shed, goat shed, and loafing sheds. See drawings for salvaged materials. o All existing paddock and arena fencing complete, backfill holes left by removal. See drawings for salvaged materials. o Site cleanup including removal of trash, abandoned equipment wood piles, manure piles, small trees and brush as indicated in the drawings o Horse stalls in the main arena. o Add-Alternate 1 o See drawings and summary of work for additional details. Project: THP Equine Center 12708 Pfluger Berkman Road Coupland, TX 78615 This section outlines the scope of cleanup and demolition work included in the project. Refer to the appropriate drawings and specification sections for further information about installation, preparation methods and components to be provided. The contractor is responsible for including all means and methods necessary to complete this portion of the project. The contract Documents, otherwise referred to as drawings, shall serve as a part of this scope of work showing more detail on the intent of this project. The Contractor is responsible for including all means and methods necessary to complete this project. In general, the work includes, but is not limited to, the following items: 1. See site plan markup for complete understanding of demolition and clean up scope. This list is generic in nature for major items and intended only to give an overview of general project scope. 2. Any holes in the earth left by demolition and removal are to be backfilled and compacted to provide a safe walking surface for DPS horses and personnel. 3. Completely demolish and remove the 24' x 72' shed row barn - salvage the 2x wood boards in the stalls and store on site all other components to be disposed of. 4. Completely demolish and remove wood built round pen. 5. Completely demolish and remove the small feed bunk shed behind arena building. 6. Remove all pipe rail fence around paddocks complete, separate top rail from their posts at the welded connection and salvage the top pipe rails, store on site. 7. Remove wood post fence with electric wire complete. 8. Completely demolish and remove all post and roof covered shelters in all paddock areas. 9. Remove all horse stalls and associated materials in arena barn, clean and prepare area to receive new modular stalls. 10. Completely demolish and remove all wooden fencing around the perimeter of the arena barn. 11. Clean up piles of wood shavings, manure piles, abandoned equipment throughout the entire property. 12. Remove all small trees, brush, and broken fencing on north side of shed row barn at back of property. 13. Clean up and dispose of any/all trash scattered throughout the site, burn items when possible is authorized. 14. Completely clear cut and remove all the trees and shrubs around the water tank, backfill any uprooted trees with compacted sand. 15. Clean out the hay barn completely, remove all pallets, trash and equipment complete. 16. Completely clean out the temporary shed, relocate empty shed in field as directed by owner. 17. Completely demolish and remove the goat shed and all associated fencing. 18. Rough cut / fill / level grade as necessary to provide future drive lanes, walks, hardscape lot as shown. Dimensions shown are approximate estimates only, final design and topographic information to be provided. Add Alternate 1 1. Create roadbed for driveway (exact location to be provided by architectural survey & design), rough in conduit below the roadbed, locations to be provided by owner in field.

Award

Arenas / Stadiums

$83,240.00

Public - State/Provincial

Demolition, Site Work

4

6

2

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
56
Bidding Soon
2,796
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

12708 Pfluger Berkman Rd, Coupland, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.