BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and paving for a civil project in Jarrell, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

2021 UORF and 2022 CDBG CR 305 Water Line Expansion Estimate: $460,000 The deadline to ask questions is 5/02/2025 3:00 PM CDT A. MRB Group Contact: Adam M. Luke, P.E. (adam.luke@mrbgroup.com) The Project includes the following Work: The project involves the construction of up to about 5,100 linear feet of new 12-inch diameter PVC water line, including gate valves, fittings, fire hydrants, and asphalt/concrete pavement replacement as needed. Work is to begin at the intersection of CR 307 and CR 305 and proceed west. The intent is to construct as much new pipe as possible based on market prices at the time of bidding. Project has an expected duration of 180 days. A pre-bid conference for the Project will not be held. The City of Jarrell, Williamson County, Texas, reserves the right to reject any or all bids, or to waive any informalities, or to make an award to other than the low bidder. It further reserves the right to limit the amount of the award. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate must be paid on this project. The City of Jarrell does not discriminate on the basis of handicapped status in admission or access to, or treatment or employment in, its programs and activities. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders will note that the construction plans show a water line extension of nearly 5,100 LF. However, there is only 2,700 LF in the bid form for 12 IN pipe. The intent is to begin construction at the intersection of CR 305 and CR 307, and proceed west along CR 305 as shown on the plans. Based on market bid prices, the intent is to use all currently available construction funding to close out the 2021 and 2022 CDBG grants. Additive or deductive change orders will be issued as necessary to maximize the funding. If not all 5,100 LF can be constructed with the current funding, the City will have shelf-ready construction plans when the next round of funding is available.

Bid Results

Water / Sewer

$448,073.00

Public - City

Paving, Site Work

26

20

4

5

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
3
Bidding Soon
1,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 6, 2025

Project location map

County Rd 307 & County Rd 305, Jarrell, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.