BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work for a civil project in Springfield, Missouri. Completed plans call for site work for a water / sewer project.

**As of August 13, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Rehabilitation of the James River Lift Station consisting of check valve re-placements, installation of electric valve actuators, and other miscellaneous station rehabilitation. Vacuum relief valves will also be installed on the 24" and 36" force mains leaving the lift station. Work of the Project generally includes the replacement of select process equip-ment, equipment and support repairs, coating of the existing piping, and associ-ated electrical improvements within the booster pump station, as well as instal lation of four (4) vacuum relief valve vaults along existing force main. More specifically, the Work includes, but is not limited to, construction of the following: 1. Replacement of all four (4)20-inch check valves and associated piping and instrumentation improvements. 2. Replacement of all four (4)24-inch rubber expansion joints on discharge of pumps. 3. Replacement of existing manual valve actuators (10 total) with auto-mated motorized valve actuators, valve gear boxes, and associated electrical improvements. Contractor to coor dinate with valve manufacturers for appropriately sized valve gear boxes and actuators. 4. For exterior buried 36" plug valve, PV-10-ACT, CONTRACTOR to grade area around valve and construct con-crete pad to support new motorized actuator. 5. Rehabilitation of two (2) concrete pipe supports at discharge piping elbows. 6. Installation of three (3) H2S sensors and associated electrical im-provements. Project No. 22W34260 2. Section 01 10 00 James River Lift Station Rehabilitation Summary. 7. Replacement of existing pump vibration switches and associated electrical improvements. 8. Replacement of power system monitoring equipment. 9. Preparation and recoating of all piping within the pump station. 10. Installation of four (4) vacuum relief valve vaults on existing force mains. 11. Site improvements to support items above. 12. Site electrical improvements to support items above including duct banks, instrumentation and controls.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

33

20

2

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
46
Bidding Soon
721
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 19, 2025

Project location map

5915 S Farm Rd 139, Springfield, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.