BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Renovation of a library in Perry, Illinois. Completed plans call for the renovation of a library.

Work generally consists of demolition of an existing approximately 4800 sf metal panel roof system and shingle roof system and installation of a new membrane roof with insulation; new gutters and downspouts; an additive alternate bid to apply approximately 420 sf vertical metal siding to a portion of the exterior wall. 4. Bids shall be accompanied by a Bid Bond in the amount of 5% of the TOTAL BASE BID. A certified check or bank draft, payable to the order of the North Pike Library District equal to this amount will be an acceptable Bid Bond. 5. Awards will be made to the lowest responsible bidder as reasonably determined by the Board considering conformity with specifications, terms of delivery, quality and serviceability. In evaluating these factors, the Board will necessarily consider and compare (relative to the other bidders) the experience of the bidder on this type of project or similar projects, AND the performance history of the bidder regarding conformity with specifications, meeting terms of delivery and quality of work AND the performance history and ability of the bidder to service the product (including response time to service calls). THE BOARD IS NOT OBLIGATED TO ACCEPT THE LOWEST DOLLAR BID AND RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS OR TO WAIVE ANY INFORMALITIES, IRREGULARITIES, TECHNICALITIES, OR DEFECTS IN ANY BID SHOULD THE BOARD DEEM IT IN THE BEST INTEREST OF THE DISTRICT TO DO SO. 6. Awards, if made, will be made within sixty (60) days following the opening of these bids. 7. Labor Statutes, Prevailing Wage Rates - In the employment and use of labor, contractors will be required to conform to all Illinois statutory requirements regarding labor and to pay not less than the prevailing rate of wages for all classifications of labor as determined by the Illinois Department of Labor. Prevailing wages are subject to change. Certified payroll records shall comply with the requirement of 820 ILCS 130/5. 8. Prospective bidders must comply with 30 Illinois Compiled Statutes 570 et seq. regarding preference to Illinois citizens or public works projects. 9. The bidder shall comply with the applicable provisions of the Illinois Human Rights Act specifically including but not limited to the requirement of 775 ILCS 5/2-105 that bidder shall have a written sexual harassment policy in place including at a minimum those requirements of such statutory provision. 10. The bidder shall comply with the requirement of 820 ILCS 265/15 that bidder shall have a written substance abuse prevention program in place including at a minimum those requirements of such statutory provision. 11. All work on this project can begin on upon notice of award and must be substantially complete by within 90 calendar days. Question Deadline 04/24/2025

Bid Results

Library

$109,700.00

Public - City

Renovation

5

10

11

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
28
Bidding Soon
835
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

Project location map

206 W Main St, Perry, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.