Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Renovation of a swimming pool in Lebanon, Oregon. Completed plans call for the renovation of a swimming pool.
The scope of work includes the following: All design and engineering services required to permit and construct the work described herein. Demolish in such a way that the diving board will be able to be reused. Demolish the existing pool gutter on the main pool and warming pool. Demolish and remove the existing main drain. Cap all piping below existing shotcrete. If lines are exposed remove completely under deck areas. Demolish and remove existing painted plaster in main pool and warming pool. Demolish and remove existing waterline and lane marker tiles. Demolish and remove existing steel angle iron at base of overhead doors. Demolish and remove existing pool coping. Remove existing HVAC floor grates at building perimeter. Remove/replace existing deep-end pool access stairs and handrails or keep in place Ad new main drains in accordance with Code. Add new waterline and lane marker tiles. o All thin-set mortar to comply with ANSI A118.6 Add new Hydrazzo, or approved equal, plaster coating Add new concrete deck with broom finish throughout the space. o Add areas under new concrete to be compacted and sloped to drains. Add new stainless steel HVAC floor grates in locations removed. o Inspect all duct work to 24 below finish floor to check for water damage and/or rust. Add new concrete deck pool coping. Add new stainless steel pool gutter at main pool and warming pool. Add new surge tank in pool deck area. Add new depth markers in pool deck Add new No Diving markers in pool deck Replace all existing deck lids with new. Decommission existing surge tank and backfill, pour new concrete cap. Power wash exterior concrete slab at completion of work. Provide all electrical connections as required by code. Commissioning: Hydrostatic testing for a period of 24-hours. Initial start-up with maintaining that the pool is clean and chemically balanced for a period of 14 days from date of substantial completion. Owner training Operation and Maintenance Manuals Possible Alternates: Add new floor drain in Family Restroom. Tie the drain into the existing drainage system. Replace existing window system The DBC firms responding to this RFP will be evaluated based upon qualifications, prior experience, proposed approach (including schedule and plan for completing the work); schematic design fee, and any other evaluation criteria identified in this procurement. ANY PROTEST OR REQUEST FOR CHANGE MUST BE DELIVERED IN WRITING TO David McKay, HMK Company at PO Box 3223 Salem, OR 97302 on or before seven (7) calendar days prior to the due date for proposals. This contract is for a public work subject to ORS 279C.800 to 279C.870 (the Oregon Prevailing Wage Rate Law). If the contract amount is over $50,000.00, BOLI wage rates will be applicable to this project. The wage rates are included in the bid documents, which are available as noted above. No bid for a construction contract shall be received or considered by the public contracting agency unless the bidder is licensed by the Construction Contractors Board of the State of Oregon as required by ORS 701.035 and 701.055. Each bid must identify whether the bidder is an Oregon resident bidder, as defined in ORS 279A.120. Bidder's attention is directed to compliance with ORS 279C.370 regarding submission of the First-Tier Subcontractor Disclosure Form. If the contract amount exceeds $100,000.00, the First-Tier Subcontractor Disclosure Form will be required and may be submitted either with the bid or within two (2) hours after the bid closing time and date at the bid site address. Failure to provide the First-Tier Subcontractor Disclosure Form may result in bid rejection. The District reserves the right to reject any or all bids, to waive formalities, and to postpone the award of the contract for thirty (30) days. All bids and all prices quoted in bids shall be firm for a period of thirty (30) days after the bid closing date. Question Deadline 05/01/2025 Emailed questions will be accepted at amelia.stirewalt@hmkco.org, HMK Company
Post-Bid
Swimming Pools
$2,855,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 2, 2025
1800 S 5th St, Lebanon, OR
Related To This Project
Lebanon, OR
Bid Date: May 01 2025
Lebanon, OR
Bid Date: May 13 2025
Lebanon, OR
Bid Date: Jun 03 2025
Lebanon, OR
Bid Date: Jun 26 2025
Lebanon, OR
Bid Date: Sep 16 2025
Lebanon, OR
Bid Date: Sep 11 2025
Lebanon, OR
Bid Date: Mar 11 2025
Lebanon, OR
Bid Date: Feb 26 2025
Lebanon, OR
Bid Date: Feb 11 2025
Lebanon, OR
Bid Date: Jan 14 2025
Lebanon, OR
Bid Date: Oct 15 2024
Lebanon, OR
Bid Date: Oct 01 2024
Lebanon, OR
Bid Date: Jun 25 2024
Lebanon, OR
Bid Date: Apr 29 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
