Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 9, 2025
Site work and renovation of a mixed-use development in Stevens Point, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.
Re-roofing, re-cladding and overall weather-tightening of the Don Friday Press Box at Goerke Park. Refer to Front-End Documents for full Project Description. Completion Date: 3 Options: Option 1 - Project Start Date: Immediately. Option 1 - Project Final Completion (no later than): August 15, 2025. Option 2 - Project Start Date: November 15, 2025 Option 2 - Project Final Completion (no later than): April 15, 2026 Option 3 - Project Start Date: June 1, 2026 Option 3 - Project Final Completion (no later than): August 15, 2026. Anticipated Award Date: May 20, 2025 Question Deadline 05/02/2025 Questions should be emailed to rhegge@ramaker.com and copied to dkremer@stevenspoint.com. Base Bid o Complete Re-Cladding of Don Friday Press Box as indicated in drawings o Complete replacement of Existing Roofing at Press Box and Upper Boxes. o Please note, inspection of the existing structure beneath the existing membrane roof will be necessary once roof has been removed, as past leaking issues have been identified but source/cause of leaking is unknown at this time. o Complete replacement of existing windows o Salvage (4) existing glazing panes from north end (Chancellor's Box). o (2) existing salvaged glazing panes to be reused at upper media level boxes. o Please note, inspection of the existing structure surrounding the existing windows will be necessary once windows have been removed, as past leaking issues have been identified but source/cause of leaking is unknown at this time. o Install insulation in all exterior wall cavities and floor cavities. o Please note, inspection of all exposed wall studs, all floor joists, and all exposed floor sheathing will be necessary prior to installing insulation. o Wall insulation options include batt, spray foam or injected foam. Note: batt and spray foam will require the removal and reinstallation of existing siding/sheathing. o Floor insulation must be spray foam o Install soffit and insulation around exposed duct work at (2) main entrances. o Removal and disposal of existing RTU atop Don Friday Press Box. Replacement of RTU in-kind as indicated in the Specifications. o Removal of existing Mini-Split atop Don Friday Press Box. Store and reinstall. o Removal and reinstallation of all press-box mounted equipment as identified on the plans and as directed by the owner. o Electrical connection of RTU and reconnection of Mini-Split. o Removal of (2) existing entry doors and frames. o Replacement of remaining (5) exterior doors with insulated, exterior-rated doors.
Post-Bid
Playgrounds / Parks / Athletic Fields
$590,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
1100 Minnesota Ave, Stevens Point, WI
Related To This Project
Stevens Point, WI
Bid Date: May 20 2025
Stevens Point, WI
--
Stevens Point, WI
Bid Date: May 22 2025
Stevens Point, WI
Bid Date: May 29 2025
Stevens Point, WI
--
Stevens Point, WI
--
Stevens Point, WI
--
Stevens Point, WI
--
Stevens Point, WI
Bid Date: Apr 16 2025
Stevens Point, WI
Bid Date: Mar 25 2025
Stevens Point, WI
Bid Date: Apr 02 2025
Stevens Point, WI
Bid Date: Apr 01 2025
Stevens Point, WI
Bid Date: Mar 18 2025
Stevens Point, WI
Bid Date: Mar 03 2025
Stevens Point, WI
Bid Date: Mar 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.