BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 9, 2025

Site work and renovation of a mixed-use development in Stevens Point, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Re-roofing, re-cladding and overall weather-tightening of the Don Friday Press Box at Goerke Park. Refer to Front-End Documents for full Project Description. Completion Date: 3 Options: Option 1 - Project Start Date: Immediately. Option 1 - Project Final Completion (no later than): August 15, 2025. Option 2 - Project Start Date: November 15, 2025 Option 2 - Project Final Completion (no later than): April 15, 2026 Option 3 - Project Start Date: June 1, 2026 Option 3 - Project Final Completion (no later than): August 15, 2026. Anticipated Award Date: May 20, 2025 Question Deadline 05/02/2025 Questions should be emailed to rhegge@ramaker.com and copied to dkremer@stevenspoint.com. Base Bid o Complete Re-Cladding of Don Friday Press Box as indicated in drawings o Complete replacement of Existing Roofing at Press Box and Upper Boxes. o Please note, inspection of the existing structure beneath the existing membrane roof will be necessary once roof has been removed, as past leaking issues have been identified but source/cause of leaking is unknown at this time. o Complete replacement of existing windows o Salvage (4) existing glazing panes from north end (Chancellor's Box). o (2) existing salvaged glazing panes to be reused at upper media level boxes. o Please note, inspection of the existing structure surrounding the existing windows will be necessary once windows have been removed, as past leaking issues have been identified but source/cause of leaking is unknown at this time. o Install insulation in all exterior wall cavities and floor cavities. o Please note, inspection of all exposed wall studs, all floor joists, and all exposed floor sheathing will be necessary prior to installing insulation. o Wall insulation options include batt, spray foam or injected foam. Note: batt and spray foam will require the removal and reinstallation of existing siding/sheathing. o Floor insulation must be spray foam o Install soffit and insulation around exposed duct work at (2) main entrances. o Removal and disposal of existing RTU atop Don Friday Press Box. Replacement of RTU in-kind as indicated in the Specifications. o Removal of existing Mini-Split atop Don Friday Press Box. Store and reinstall. o Removal and reinstallation of all press-box mounted equipment as identified on the plans and as directed by the owner. o Electrical connection of RTU and reconnection of Mini-Split. o Removal of (2) existing entry doors and frames. o Replacement of remaining (5) exterior doors with insulated, exterior-rated doors.

Post-Bid

Playgrounds / Parks / Athletic Fields

$590,000.00

Public - City

Renovation, Site Work

13

12

11

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
31
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

1100 Minnesota Ave, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.