BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 23, 2025 at 8:00 PM

Updated May 22, 2025

Renovation of a military facility in Fort Benning, Georgia. Completed plans call for the renovation of a military facility.

The objective of this mechanical scope is to replace the existing field controllers, communications trunk and integrate all points into the UMCS. The buildings will be occupied. Phasing will not be required. The lower floor of these buildings will have restricted access and coordination with user will be necessary throughout the project. The sleeping bay areas will not have restricted access. The following scope states the key objectives that must be met. Ensure field changes meet all the necessary codes/standards. Scope of Work for Demo in 2833/2834 1. Mechanical Demolition a. Remove all LON based field controls. b. Remove LON trunk. Scope of Work for New Work in 2833/2834 1. Mechanical New Work a. Install new BACnet MS/TP Distech field controllers (Or approved equivalent) on all devices previously controlled using LON b. All low voltage and control wiring shall be sealed in conduit if exposed. c. Assume no Fort Benning base maintenance controls support. If controls support is approved, provide a minimum of 2 weeks of notice of when you will need Fort Benning controls support. d. All equipment points and existing control points shall be brought onto the UMCS and have their graphics designed per Fort Benning's programming and graphics standards. All Controls and Graphics integration shall be brought onto the building JACE, and finally at the Niagara 4 (N4) server. All Controls and Graphics must be made visible/ controllable at Fort Benning's UMCS Building 497 through the N4 server. The final "master system integration" (From Bldg. JACE to N4 Server) will require a DoD 8570 IAT Level II credentialed person with access to the server. Coordinate with NEC for CAT5 drops, ports, IP/mac address, and switch installations. e. Size provide and install non-proprietary open JACE 9000 series. Total number of used device/points shall not exceed 80% of installed JACE9000 series capacity. f. Any new JACE install shall be support by uninterrupted power supply (UPS) and be protected with (TSS) PN - 110318

Post-Bid

Military

$1,391,000.00

Public - City

Renovation

164

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
70
Bidding Soon
715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

July 21, 2025

Project location map

Multiple Locations, Fort Benning, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.