Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 30, 2025 at 8:00 PM
Updated May 23, 2025
Site work for a water / sewer project in Cordele, Georgia. Completed plans call for site work for a water / sewer project.
generally consisting of furnishing all products and performing all labor necessary to accomplish the rehabilitation of approximately 21,474 l.f. of 8", 10, and 15" sanitary sewer main by the Cured-inPlace Method, the rehabilitation of approximately 80 sanitary sewer manholes, 1,543 l.f. of 12" gravity sanitary sewer lines, 130 l.f. 6" sanitary sewer forcemain replacement, 8 sanitary sewer manholes PROJECT NO. LE 22065, JN: 22065 PROPOSAL GUARANTY: A bid bond shall be required in the amount of 5% of the total bid amount. 1.1.05 BONDS REQUIRED: A Contract Performance Bond and a Materials and Payment Bond will be required of the successful bidder. 1.1.06 NO PROPOSALS WITHDRAWN: No submitted proposal may be withdrawn for a period of sixty (60) days after the closing time scheduled for the receipt of bids. 1.1.07 OWNERS RIGHTS RESERVED: The City of Cordele reserves the right to reject any or all Proposals and to waive any formality or technicality and to award the Proposal as may be in the best interest of the Owner, or readvertise for bids. The Owner may issue change orders altering the original scope of work to address changes or unforeseen conditions necessary for the project completion. 1.1.08 GUARANTY: The Contractor shall warrant all materials and labor for one year after the date of final acceptance by the Owner and the Engineer. 1.1.09 FUNDING: The project will be funded through the ARPA State Fiscal Recovery Funds and local funds. All Federal Labor Standards shall apply. 1.1.10 PERMITS: All anticipated permits have been obtained by the Owner for construction associated with this project. Reference Section 3.1.18 Appendix A for GUPS Permit information. 1.1.11 Land/Easement Acquisition: All anticipated rights-of-way and easements have been obtained by the Owner for construction associated with this project. 1.1.12 BID SUBMITTALS: Reference Section 1.2 "Information for Bidders" for bid submittal requirements. 1.1.13 PROJECT COMPLETION: All work on the project must be completed within 180 consecutive calendar days from the date of the Notice to Proceed with Construction. 1.1.15 QUESTIONS: The final day any questions will be accepted shall be Friday, May 16, 2025 at noon. Question Deadline 05/16/2025 at 12:00 PM ET
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
June 23, 2025
Multiple Locations, Cordele, GA
Related To This Project
Cordele, GA
Bid Date: Sep 30 2025
Cordele, GA
Bid Date: Feb 04 2019
Cordele, GA
Bid Date: Dec 19 2025
Cordele, GA
Bid Date: Feb 20 2026
Cordele, GA
Bid Date: Mar 17 2026
Cordele, GA
Bid Date: Apr 02 2026
Cordele, GA
Bid Date: Mar 17 2025
Cordele, GA
--
Cordele, GA
Bid Date: Feb 27 2025
Cordele, GA
Bid Date: Feb 25 2025
Cordele, GA
Bid Date: Jan 15 2025
Cordele, GA
Bid Date: Dec 05 2024
Cordele, GA
Bid Date: Nov 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
