Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 1, 2025 at 8:00 PM
Updated July 2, 2025
Site work and paving for a mixed-use development in Henderson, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of July 1, 2025, the project was awarded to Kmac Contracting Llc with an awarded amount of $402,843.97.** **As of June 17, 2025, this project has not yet been awarded. The project is expected to be awarded on June 20, 2025.** City of Henderson in conjunction with the Kentucky Transportation Cabinet is accepting competitive sealed bids for the Green River Road Sidewalks This project includes installation of six-foot-wide sidewalks, curb cuts, ADA ramps and replacement of driveways, storm drainage pipe and structure work and installation of block retaining wall. Project begins at the southeast side of the intersection of Bend Gate Road and Green River Road and runs along south side of Green River Road and crosses Watson Lane and turns to cross Green River Road and runs along the north side of Green River Road and connects to an existing concrete sidewalk just past the intersection of Green River Road with Osage Drive. Questions about projects during the advertisement should be submitted in writing to the City of Henderson. This may be done by email to DRBoom@hendersonky.gov. The City will attempt to answer all submitted questions. The City reserves the right not to answer if the question is not pertinent or does not aid in clarifying the project intent. PRIMARY COMPLETION DATE: 90 days after issuance of Notice to Proceed ITEM NO 2-3210.00, 02-03210 Bidders and DBE subcontractors must be prequalified with the Kentucky Transportation Cabinet and possess a Certificate of Eligibility at time of bid opening. A DBE goal of 4% has been established for this project. All other subcontractors must be prequalified when accepting subcontracts.
Award
Roads / Highways
$402,843.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed