Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Site work and paving for a road / highway in Davenport, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Newberry Street Reconstruction For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - There are no Working Days for this contract. The Contractor shall complete all work, including final clean up and removal of all equipment for the bid by September 30, 2025. Liquidated Damages - Liquidated damages shall be $500.00 per day The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. Question Deadline 04/28/2025 at 1:00 PM CT 4/30/2025 01:00:00 PM (CT) Answers Posted Answers to inquiries that were submitted will be issued no later than the date indicated. Scope of Work and Scheduling This project is located on Newberry Street from end of Street near Lincoln Court to N. Pine Street. The proposed improvements include, but are not limited to, the furnishing of all labor, materials and equipment for the reconstruction of the existing concrete roadway, installation of subdrains, reset all existing utility surface features to finish grade, replacement of the adjacent driveway approaches, ADA compliant sidewalk curb ramps, sidewalk replacement, topsoil, sodding, and erosion control. The quantities herein represent the Engineer's estimate of the amount of work to be completed. Actual as-built quantities may vary from bid quantities. The contract time shall be per SUDAS Section 1080-1.02, A.1, Completion Date Contracts. It is anticipated that the contract will be approved on May 28, 2025 and the Notice to Proceed will be issued for an anticipated start date for construction no sooner than July 1, 2025, and once all contract documents have been executed. There are no Working Days for this contract. The Contractor shall complete all work, including final cleanup and removal of all equipment for the bid by September 30, 2025. Liquidated damages shall be $500 per day.

Award

Roads / Highways

$440,025.00

Public - City

Paving, Site Work

47

5

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
81
Bidding Soon
1,121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

July 1, 2025

Project location map

Newberry St, Davenport, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.