Site work and paving for a mixed-use development in Mississauga, Ontario. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Scope of work - Scarboro Street Bridge Repair over West Branch of Mimico Creek. The Work includes all as shown on the Contract documents and below but is not limited to: - Install erosion and sediment control. - Clearing and grubbing and providing temporary access roads. - Complete closure of the road to the vehicular traffic and closure of sidewalks to pedestrians on Scarboro Street and place proper signage. - Clearing and grubbing including disposal off-site of unsuitable materials. - Tree protection. - Removal of the existing asphalt and waterproofing system on deck and approach grades. - Patch repairs on deck top, soffit, fascia, abutments and wingwall. - Scarifying existing west sidewalk and remove east sidewalk on bridge. - Remove concrete curb and gutter, sidewalks on grade, as shown on Contract Drawings. - Excavate approaches, repair deck ends and construct new approach slabs at both approaches as shown on Contract Drawings. - Concrete removal from top of the wingwalls, ballast walls, parapet wall etc. as shown on the Contract Drawings. - Elimination of the expansion joints. - Installation of waterproofing system on the bridge deck and new approach slabs. - If required adjustment of the Catch Basin to match with the proposed modification work. - Paving of the approaches and bridge deck. - Construct new east sidewalk and provide an overlay on west sidewalk on bridge. - Reconstruct sidewalks, concrete curb and gutter on grade. - Reconstruct top of wing walls, ballast walls, parapet walls etc. as shown on contract Drawings. - Backfill behind the abutment wall, wing walls as shown on Contract Drawings. - Modification to gabion walls. - Restore the site to pre-construction conditions or better. Scope of work - Pedestrian Bridge Over Battleford Road and Trail Work: The Work includes all as shown on the Contract documents and below but is not limited to: - Install erosion and sediment control. - Clearing and grubbing and providing temporary access roads, if required. - Removal of existing abutment and bridge structure. - Installation of new abutments on helical piles. - Installation of new pedestrian bridge on abutments, complete with concrete deck. - Regrading of trails to adjust slope. - Installation of Sienna Stone retaining walls along new trail. - Restore the site to pre-construction conditions or better. Documents can be obtained from https://mississauga.bidsandtenders.ca/

Award

Bridges / Tunnels

$2,889,166.00

Public - City

Paving, Site Work

70

8

8

7

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
5
Bidding Soon
2,328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 3, 2025

Project location map

Multiple Locations, Mississauga, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.