BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work, paving and renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

**As of October 28, 2025 , this project has not yet been awarded. The targeted award date is late December 2025/early January 2026** The Boarding Area F (BAF) Refresh Project (Project) will program, design, construct, commission, and activate reconfigured aircraft parking positions with new passenger boarding bridges (PBBs) and associated aircraft systems at select gates in Terminal 3, BAF. These gates, approximately seven (7) in total, will accommodate a mix of narrow and wide-body aircraft. The Project will also include installation of Common Use Systems and Infrastructure for, both aircraft systems (Advanced Visual Docking Guidance Systems (AVDGS), camera, Operational Wi-Fi, etc.) and boarding systems (FIDs, Gate Podiums, etc.) for each gate, as well as repairs and improvement of the apron pavement and the fuel hydrant system. The Project inacludes Air Operations Area (AOA) construction, civil engineering, utility infrastructure, foundations, superstructure, special systems, mechanical, plumbing, and telecommunication systems. Additionally, the Project will modernize the interior of the BAF (refer to Exhibit 1, Boarding Area F Plan View) to enhance the passenger experience, upgrade the restrooms, address aging building systems, renovate outdated hold rooms, comply with current sustainability codes, standards, and Airport requirements, and expand the concessions program- all while minimizing impacts to active operations. The Project will also include minor Baggage Handling System (BHS) improvements , such as replacing and reconfiguring the baggage claim carousels in Terminal 3 Arrivals. Oral Interviews (Tentative): Week of July 7, 2025 Period for Protesting Notice of Intent to Award: Within five (5) business days of the City's issuance of a Notice of Intent to Award Award of Contract (Tentative): September 2025 Notice to Proceed (Tentative): October 2025 Question Deadline 04/24/2025 at 5:00 PM PT Proposers must submit questions through Online. This project upgrades Terminal 3 - Boarding Area F (BAF) to enhance passenger experience, gate flexibility, and critical infrastructure. Key improvements include gate reconfiguration for various aircraft sizes, replacement of select passenger boarding bridges, installation of automated aircraft guidance systems, upgrades to pre-conditioned air systems, fire and fuel hydrants, pavement repairs, and targeted interior enhancements.

Post-Bid

Transportation Terminals

$180,000,000.00

Public - City

Paving, Renovation, Site Work

3

7

8

5

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
16
Bidding Soon
1,836
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

January 5, 2026

Project location map

To Be Determined, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.