BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2025 at 8:00 PM

Updated May 18, 2025

Renovation of a mixed-use development in Orange, California. Completed plans call for the renovation of a educational facility.

Interior Painting at Canyon Hills & Exterior Painting of Facia Trim & Doors at Multiple Sites This project includes but is not limited to interior classroom painting at Canyon Hills School, and exterior painting of facia, trim, and doors at Nohl Canyon, and West Orange Elementary Schools. Q&A Deadline 05/01/2025 4:00 PM (PDT) Email Bids@OrangeUSD.org or call 714-628-4440. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 30 Days Bid Valid 90 Days Liquidated Damages $1,500 per calendar day QUESTIONS REGARDING THIS NOTICE: Email Bids@OrangeUSD.org or call 714-628-4440. (1) Nohl Canyon Elementary School - Exterior trim and fascia painting of all buildings (2) Nohl Canyon Elementary School, 4100 Nohl Ranch Rd., Anaheim CA 92807. (3) The Project Scope of Work includes the following: (a) Contractor responsible for: 1) Pressure wash all buildings to remove loose paint and dirt. 2) Mask, cover and protect surfaces not scheduled for painting with adequate protection. 3) Provide and spread drop cloths when and where required to provide the necessary protection. 4) Prep, sand, wipe down/clean make sure all surfaces scheduled for painting are ready for new paint coatings. 5) Paint all areas indicated on the checklist of Exhibit A: Exterior Re-Paint Specification a) 1 Coat of District provided Vista Primer b) 2 Coats District provided Vista Paint. District will select color. 6) Remove all materials, supplies, debris, and rubbish and leave each area clean, acceptable condition. (4) West Orange Elementary School - Exterior trim and fascia painting of all buildings (5) West Orange Elementary School, 243 S. Bush St., Orange, CA 92868. (6) The Project Scope of Work includes the following: (a) Contractor responsible for: 1) Pressure wash all buildings to remove loose paint and dirt. 2) Mask, cover and protect surfaces not scheduled for painting with adequate protection. 3) Provide and spread drop cloths when and where required to provide the necessary protection. 4) Prep, sand, wipe down/clean make sure all surfaces scheduled for painting are ready for new paint coatings. 5) Paint all areas indicated on the checklist of Exhibit B: Exterior Re-Paint Specification a) 1 Coat of District provided Vista Primer b) 2 Coats District provided Vista Paint. District will select color. 6) Remove all materials, supplies, debris, and rubbish and leave each area clean, acceptable condition. (7) Canyon Hills School - Interior painting of Administration offices, nine classrooms, four pods, and 3 restroom hallways (8) Canyon Hills School 260 Imperial Hwy., Anaheim, CA 92807 (9) The Project Scope of Work includes the following: (a) Contractor responsible for: 1) Pressure wash all buildings to remove loose paint and dirt. 2) Mask, cover and protect surfaces not scheduled for painting with adequate protection. 3) Provide and spread drop cloths when and where required to provide the necessary protection. 4) Clean all walls and surfaces scheduled for painting of loose and scaly paint, dust, chalk efflorescence, and other foreign matter by sanding and scraping as required to provide a clean, sound surface for the new paint coatings. Patch cracks. 5) Administration Offices: Paint all areas indicated on the checklist of Exhibit C: Interior Re-Paint Specification a) 1 Coat of District provided Vista Primer b) 2 Coats District provided Vista Paint. District will select color. 6) Nine Classrooms: Paint all areas indicated on the checklist of Exhibit A: Interior Re-Paint Specification a) 1 Coat of District provided Vista Primer b) 2 Coats District provided Vista Paint. District will select color. 7) Four Pods: Paint all areas indicated on the checklist of Exhibit A: Interior Re-Paint Specification a) 1 Coat of District provided Vista Primer b) 2 Coats District provided Vista Paint. District will select color. 8) Three Restroom Hallways: Paint all areas indicated on the checklist of Exhibit A: Interior Re-Paint Specification a) 1 Coat of District provided Vista Primer b) 2 Coats District provided Vista Paint. District will select color. 9) Remove all materials, supplies, debris, and rubbish and leave each area clean, acceptable condition License Requirements C-33 - Painting & Decorating; see Notice Inviting Bids The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received or in the bidding.

Award

Educational

$127,300.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
651
Active Projects
280
Bidding Soon
3,686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

Multiple Locations, Orange, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.