Renovation of a water / sewer project in Turtle Lake, North Dakota. Completed plans call for the renovation of a water / sewer project.
Reference Number 0000291776 Question Acceptance Deadline 2025/05/04 02:00:00 PM NDT The scope of work generally includes, but is not necessarily limited to, all items shown on the project drawings and more particularly described in the MERX Bid Sheet of the Contract Documents and included in this section and any additional works as directed by the Engineer to complete the work. The mobilization of all labour, plant and materials to the project site. The supply and installation of the Project Sign.. Maintain the water system to residents during construction. The Contractor is responsible for co-ordination with the power utility and all permits and scheduling as necessary on the project. The supply and installation of a new pump in the allocated space complete with all valves, piping and misc. materials necessary to complete installation. The supply and installation of a variable frequency drive programmed for constant pressure booster pump function. The VFD shall be installed in a new floor mounted enclosure complete with hinged door. The VFD interface shall be installed on the door exterior. The enclosure shall be equipped with all necessary disconnects, protective devices and terminations to allow for connection to, but not limited to, new pump, power, existing control panel, pressure transmitter. The supply and installation of a pressure transmitter complete with all misc. piping, fittings and valve in existing pressure manifold. The supply and installation of new breaker in existing electrical panel. The supply and installation of new power wiring between the existing electrical panel and the new VFD panel. The supply and installation of new power wiring between the new VFD panel and the new pump. The supply and installation of new control and communication wiring between the new VFD panel and the existing pump control panel. The supply and installation of control wiring between the new pressure transmitter and the pumphouse control panel. The full configuration and testing of the new pump and VFD to the satisfaction of the Engineer. All reinstatement and cleaning of properties as required. The completion of all deficiencies as directed by the Engineer including final cleanup and demobilization from the project site. The bid bond shall be at least ten percent (10%) of the bid amount (without HST). All bids, regardless of monetary value require a Bid Security of at least ten percent (10%) of the bid amount (without HST), with a minimum security of five hundred dollars ($500.00). Bid Securities shall be in the form of a Bid Bond or Certified cheque in favour of the Owner. An approved Certified cheque may be substituted in lieu of the bid bond. The bidding security will be returned upon receipt of the Performance and Labour and Materials Bonds. A Performance Bond will be required in the amount of fifty percent (50%) of the contract price (exclusive of HST). The Performance Security is to be received not later than fourteen (14) calendar days after the award of the contract and prior to the formal execution of the agreement. No work is to be undertaken until the Performance Security has been received. Performance Security will not be required for a contract value of less than $25,000. A Labour and Materials Payment Bond will be required in the amount of fifty percent (50%) of the contract price (exclusive of HST). The Labour and Materials Payment Bond is to be received not later than fourteen (14) calendar days after the award of the contract and prior to the execution of the formal agreement. No work is to be undertaken until the Labour and Materials security has been received. Labour and Materials security will not be required for a contract valued at less than $25,000. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Water / Sewer
$700,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 9, 2025
To Be Determined, Turtle Lake, ND
Related To This Project
Turtle Lake, ND
--
Turtle Lake, ND
Bid Date: Jul 10 2025
Turtle Lake, ND
Bid Date: Jul 10 2025
Turtle Lake, ND
Bid Date: Oct 02 2025
Turtle Lake, ND
Bid Date: Nov 06 2025
Turtle Lake, ND
--
Turtle Lake, ND
Bid Date: May 01 2025
Turtle Lake, ND
Bid Date: Mar 27 2025
Turtle Lake, ND
Bid Date: Mar 06 2025
Turtle Lake, ND
Bid Date: Feb 04 2025
Turtle Lake, ND
Bid Date: Jan 27 2025
Turtle Lake, ND
Bid Date: Jan 08 2025
Turtle Lake, ND
--
Turtle Lake, ND
Bid Date: Nov 08 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.