Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Site work and paving for a civil project in Turtle Lake, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Construction of the Final Pavement Lifts Site Directions: Please contact the Project Engineer if you need directions to the Project Location. Est. Value: $ 800,000.00 Est. Completion Date: Sept. 20, 2025 The project is generally described as follows: SECTION 1 - Cub Creek First Addition overlay. This section includes milling, hot bituminous pavement overlay, and incidentals. SECTION 2 - Maple Lakes Estates Addition Ph I overlay. This section includes milling, hot bituminous pavement overlay, concrete curb and gutter, concrete sidewalk, minor grading, and incidentals. SECTION 3 - Lakeview Addition overlay. This section includes milling, hot bituminous pavement overlay, pavement markings, tree removal and replacement, and incidentals. SECTION 4 - Miscellaneous City Street Patching. This section includes hot bituminous pavement patching The project consists of the following approximate quantities: 19401 SY Milling Pavement Surface 49 LF 24" Mountable Curb and Gutter 32 SY Sidewalk Concrete 4IN Reinforced 3806 TON Superpave FAA 43 248 TON PG 58-28 Asphalt Cement 2078 GAL Tack Coat 683 SY Full Depth Pavement Patching 57 EA Adjust Manhole Casting & Cover 31 EA Adjust Gate Valve Box 33 EA Trees (As Specified) 1658 SY Seeding 1658 SY Hydromulch 1 LSUM Drainage Repair 711 LF Preformed Patterned Pavement Marking - Grooved (Various Sizes as Specified) 86 SF Pavement Marking Message Preformed Patterned - Grooved Traffic Control and all miscellaneous work necessary therefore and incidental thereto. The work is to commence upon a date to be specified by the OWNER, notice of which will be given to the successful bidder ten (10) days in advance of the start of construction. The Contractor will be required to commence construction and substantially complete all work for the project by September 6th, 2025. If any person contemplating submitting a Proposal is in doubt as to the true meaning of any part of the Drawings, Project Manual, or other Contract Documents, or finds discrepancies in or omissions from the Drawings or Project Manual, they may submit to the ENGINEER a written request for an interpretation or correction thereof. B. The person submitting the request will be responsible for its prompt delivery. C. Any interpretation or correction of the documents will be made only by Addendum duly issued. 1. Notice of the Addendum will be e-mailed to the address provided by plan holders that obtained digital copies of the documents. a. Said plan holders are required to download the Addendum. 2. Hard copies of the Addendum will be sent to plan holders that purchased a paper copy of the documents. D. Neither the OWNER nor the ENGINEER will be responsible for any other explanations or interpretations of the Contract Documents
Award
Roads / Highways
$498,513.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
April 7, 2025
Multiple Locations, Turtle Lake, ND
Related To This Project
Turtle Lake, ND
Bid Date: Mar 27 2025
Turtle Lake, ND
Bid Date: May 01 2025
Turtle Lake, ND
Bid Date: May 06 2025
Turtle Lake, ND
--
Turtle Lake, ND
Bid Date: Jul 10 2025
Turtle Lake, ND
Bid Date: Jul 10 2025
Turtle Lake, ND
Bid Date: Oct 02 2025
Turtle Lake, ND
Bid Date: Feb 04 2025
Turtle Lake, ND
Bid Date: Jan 27 2025
Turtle Lake, ND
Bid Date: Jan 08 2025
Turtle Lake, ND
--
Turtle Lake, ND
Bid Date: Nov 08 2024
Turtle Lake, ND
Bid Date: Aug 01 2024
Turtle Lake, ND
Bid Date: Aug 01 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
