BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a mixed-use development in Cheboygan, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Garfield Avenue and S F Street Roadway Rehabilitation Project Question Deadline 05/08/2025 Questions may be emailed to lmarion@hrcengr.com 69 miles of HMA surface removal and replacement, miscellaneous shoulder gravel supplementation, ADA ramp replacement, and pavement markings. Surface Replacement: The proposed roadway rehabilitation of Garfield Avenue & S F Street includes the removal of existing ~4 inches of deteriorated HMA and replacing with 5 inches of HMA, the supplementation of aggregate base as needed to achieve planned grade, the miscellaneous addition of shoulder gravel to refresh existing gravel shoulders and to create new gravel shoulders where necessary. Miscellaneous Construction: upgrades at all pedestrian crossings to meet ADA compliance, centerline and edge-line pavement markings, miscellaneous full-depth spot repairs to improve areas that indicate sub-grade failure, and turf restoration in all disturbed areas. There will also be storm manhole, sanitary manhole, and water main gate valve cover adjustments and replacements as needed. Project Description: HMA Pavement Removal and Resurfacing of Garfield Avenue From the North Intersection Of East Lincoln Avenue to the South Intersection of S F Street at (Us-23) State Street. Full Depth HMA Pavement Removal and Replacement With 5" HMA Pavement. Subsurface to Be Evaluated After Removal and Aggregate Base Applied Where Necessary. Removal and Replacement of Sections of Curb, Gutter and Driveways, as Needed and Noted on the Log Sheets. Ada Ramps and Sidewalks to Be Evaluated for Replacement. New Pavement Markings Within the Project Limits. Maintenance of Traffic Plans Are Included in The Log Plan Set. Summer 2025 Construction. Project estimate: $550,000 - $750,000 Contact information Contact name: Lucas Marion Contact phone: 2315778797 Contact email: lmarion@hrcengr.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
13
Bidding Soon
183
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 1, 2025

Project location map

Garfield Avenue & S F Street, Cheboygan, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.