BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a water / sewer project in Tampa, Florida. Completed plans call for site work for a water / sewer project.

Individuals qualified to construct a new berth with an additional onshore high wind mooring point located in Gibsonton, Florida. PTB encourages the use of registered Small Business Enterprise (SBE) firms to the greatest extent possible on projects and has a goal of nine percent (9%) SBE participation. PTB will consider SBE participation when evaluating the responses. Questions concerning this Procurement should be directed to Amanda Roche of PTB's Procurement Department, at (813) 905-5008 or by e-mail at aroche@tampaport.com Question Deadline 05/02/2025 at 5:00 PM ET All requests for interpretation shall be in writing to the Port Tampa Bay (PTB) Procurement Department, sent by e-mail to aroche@tampaport.com The general scope for Contract No. 23-00323 consists of the construction of a new 503ft by 115ft on the east and 92ft on the west, berth with an additional onshore high wind mooring point located in Gibsonton, Hillsborough County, Florida, in Section 34, Township 31 South, Range 19 East, west of the existing Berth 302 on the south center side of Port Redwing, which is currently an unimproved site. The project includes the following: 1. The perimeter of the 53,200ft 2 Berth 301 will be constructed of a steel sheet pile combination wall with reinforced concrete cap along two sides and approximately 40,170ft2 of imported structural fill will be utilized to fill the interior portion and will be capped with an asphaltic pavement section. 2. One pile supported high wind mooring point. 3. Multiple mooring bollards and fender systems. 4. Upland improvements include grading, utilities (electrical, water and stormwater), and lighting. 5. Installation of an asphaltic access road will be included along the north side of Berth 301, and will connect to the existing access road at the west end of the new berth. Completion-300 calendar days

Award

Water / Sewer

$18,247,000.00

Public - Federal

Site Work

61

13

9

8

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
161
Bidding Soon
2,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 17, 2025

Project location map

To Be Determined, Tampa, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.