BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Renovation of a mixed-use development in Portland, Oregon. Completed plans call for the renovation of a power facility.

Installation of a Port-furnished boiler, combustion fan variable frequency drive, and condensate neutralization kit with connections to services including, but not limited to, fuel oil, natural gas, electrical power, controls, hot water, combustion air, and exhaust; provision of a hot water pump and variable frequency drive; and provision of controls and other modifications to integrate the new boiler with the existing PDX Terminal Boiler Plant. Online Q&A Yes Q&A Deadline 05/07/2025 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The Port's DBE participation goal for this contract is 4.7 percent of the total amount bid (excluding additive alternates, if any)

Award

Transportation Terminals

$250,571.00

Public - City

Renovation

29

22

5

3

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 13, 2025

Project location map

7000 NE Airport Way, Portland, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.