Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2025 at 8:00 PM
Updated June 10, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Adams Township, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of June 09, 2025, the project was awarded to Black Horse Bridge Construction Inc, with an awarded amount of $597,905.10. PID Number: 121909 DBE GOAL %: 9% Description of Job: Replacement of WAS-T-32-0262 Bridge Location of Job: Muskingum River Rd, Adams Township Engineer Estimate: $638,468 SCOPE OF WORK 104.01 Intent of the Contract Documents. The intent of the Contract Documents is to provide for the construction and completion of the Work. Perform the Work according to the Contract Documents. 104.02 Revisions to the Contract Documents. A. General. The LPA reserves the right to revise the Contract Documents at any time. Such revisions do not invalidate the Contract or release the Surety, and the Contractor agrees to perform the Work as revised. The provisions of this section are subject to the limitation of the ORC. B. Differing Site Conditions. During the progress of the Work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the Contract Documents or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the Work provided for in the Contract Documents, are encountered at the site, notify the Engineer as specified in 108.02.F of the specific differing conditions before they are disturbed or the affected Work is performed. Upon notification, the Engineer will investigate the conditions and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any Work under the Contract, the LPA will make an adjustment and modify the Contract as specified in 108.06 and 109.05. The Engineer will notify the Contractor of the determination whether or not an adjustment of the Contract is warranted. C. Suspension of Work. If the performance of all or any portion of the Work is suspended or delayed by the Engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the Contractor believes that additional compensation or time is due as a result of such suspension or delay, notify the Engineer as specified in 108.02. Upon receipt of notice, the Engineer will evaluate the Contractor’s request. If the Engineer agrees that the cost or time required for the performance of the Work has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the Contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the Engineer will make an equitable adjustment (excluding profit) and modify the contract as specified in 108.06 and 109.05. The Engineer will notify the Contractor of its determination whether or not an adjustment to the Contract Documents is warranted. Failure of the Engineer to suspend or delay the Work in writing does not bar the Contractor from receiving a time extension or added compensation according to 108.06 and 109.05. The LPA will not make an adjustment under this subsection in the event that performance is suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this Contract. D. Significant Changes in Character of the Work. The Engineer may increase or decrease quantities and alter the Work as necessary to complete the Project. The Engineer will make appropriate adjustments according to 108.06 and 109.05, if such alterations significantly change the character of the Work. If the Contractor disagrees as to whether an alteration constitutes a significant change, use the notification procedures specified in 108.02.G. The term “significant change” is defined as follows: 1. when the character of the Work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or 2. when the product of the quantity in excess of the estimated quantity of a contract item and the unit price exceeds the limits set forth in Table 104.02-1.
Award
Bridges / Tunnels
$597,905.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 05 - Metals
Division 08 - Openings
Division 09 - Finishes
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 35 - Waterways and Marine Construction
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
Muskingum River Rd, Adams Township, OH
Related To This Project
Adams Township, OH
Bid Date: Feb 27 2025
Marion, OH
Bid Date: May 08 2025
Trenton, OH
Bid Date: Jun 11 2025
Beachwood, OH
Bid Date: May 02 2025
North Ridgeville, OH
Bid Date: May 08 2025
Akron, OH
Bid Date: May 01 2025
Chillicothe, OH
Bid Date: May 07 2025
Cleveland, OH
Bid Date: May 16 2025
Centerville, OH
Bid Date: May 06 2025
Lebanon, OH
--
North Olmsted, OH
Bid Date: May 21 2025
Fremont, OH
Bid Date: May 13 2025
Columbus, OH
Bid Date: Apr 23 2025
Walton Hills, OH
Bid Date: May 02 2025
Akron, OH
Bid Date: May 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.