Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 14, 2025 at 8:00 PM
Updated May 16, 2025
Renovation of an educational facility in Fremont, California. Completed plans call for the renovation of a 102,000-square-foot educational facility.
Question Deadline 05/01/2025 at 2:00 PM PT Questions regarding this RFQ may be directed in writing to the Bond Program Manager Facilities & Construction, Priscilla Wong, at pwong@fusdk12.net, and Omid Azizi at omid.azizi@cumming-group.com Last day to receive written questions from respondents. Pursuant to Education Code section 17250.10 et seq., the District is seeking a design-build entity or team ("Design/Builder") to design and construct the District's Irvington High School Buildings Replacement Project ("Project"). The Project is further defined in the attached APPENDIX A, along with the District's expected cost range and schedule for the Project. The District's performance specifications, which the selected Design/Builder must adhere to in delivering the Project, will be made available to prequalified respondents at the RFP stage. The selected Design/Builder must be appropriately licensed in the State of California for architectural, engineering, and construction services as needed to complete the Project. In addition, the selected Design/Builder shall have experience with both design and construction of public school facilities and in working with the Office of Public School Construction ("OPSC"), the Division of the State Architect ("DSA"), and Title 24 of the California Code of Regulations. All contractors who are part of the design-build team must be registered with the Department of Industrial Relations ("DIR") as required by law. The selected Design/Builder will be required to comply with the Labor Code prevailing wage requirements, skilled and trained workforce requirements, and the District's bonding and insurance requirements. The selected Design/Builder shall be required to work cooperatively with District staff, the Governing Board, all other technical consultants, the bridging architect, the project inspector, and any program and/or construction manager, if any, retained by the District for the Project, citizens' oversight committee, other District committees, and the community to facility timely and professional completion of the Project. Construction of a new approximately 102,000 SF school building with associated sitework and improvements to replace existing occupied school buildings. The Design Build budget, including all fees and allowances, is $90,000,000 - $95,000,000. The project includes phasing of abatement, demolition, sitework, modernization, and new improvements in order to transition from the old facilities and to construct the new buildings. Anticipated Start of Construction is Summer 2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$95,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
June 22, 2026
41800 Blacow Rd, Fremont, CA
Related To This Project
Fremont, CA
Bid Date: May 08 2025
Fremont, CA
Bid Date: Apr 30 2025
Fremont, CA
--
Fremont, CA
Bid Date: May 19 2025
Fremont, CA
Bid Date: May 19 2025
Fremont, CA
Bid Date: Jun 05 2025
Fremont, CA
Bid Date: May 19 2025
Fremont, CA
Bid Date: Apr 22 2025
Fremont, CA
Bid Date: Apr 16 2025
Fremont, CA
--
Fremont, CA
Bid Date: Apr 11 2025
Fremont, CA
Bid Date: Aug 19 2025
Fremont, CA
Bid Date: Apr 15 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
