Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated June 12, 2025
Demolition, site work, paving and addition to a mixed-use development in Sanford, North Carolina. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for site work for a detention facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Sanford Correctional Center Accessibility Improvements Site improvements including defining accessible visitor parking and access to Administration Building. Modifications to the Administration Building so they can better accommodate employees with physical disabilities. Improvements to the sidewalk from the Administration Building and the Dining Building. The addition of a guest restroom in the dining building. The addition of a concrete pad in the outdoor visitation area for visitors in wheelchairs. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, or a bid bond in an amount equal to not less than five percent (5%) of the proposal, said deposit to be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law (G.S. 143-129). Bid bond shall be conditioned that the surety will, upon demand, forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract. The owner may retain bid securities of any bidder(s) who may have a reasonable chance of award of contract for the full duration of time stated in the Notice to Bidders. Other bid securities may be released sooner, at the discretion of the owner. All bid securities (cash or certified checks) shall be returned to the bidders promptly after award of contracts, and no later then seven (7) days after expiration of the holding period stated in the Notice to Bidders. Standard Form of Bid Bond is included in these specifications and shall be used. PERFORMANCE BOND The successful bidder, upon award of contract, shall furnish a performance bond in an amount equal to 100 percent of the contract price. See Article 35, General Conditions. PAYMENT BOND The successful bidder, upon award of contract, shall furnish a payment bond in an amount equal to 100 percent of the contract price. See Article 35, General Conditions. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities. RECEIPT OF BIDS Bids shall be received in strict accordance with requirements of the General Statutes of North Carolina. Bid security shall be required as prescribed by statute. Prior to the closing of the bid, the bidder will be permitted to change or withdraw his bid. Guidelines for opening of public construction bids are available from the State Construction Office.
Post-Bid
Sidewalks / Parking Lot
$300,000.00
Public - State/Provincial
Addition, Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 11, 2025
417 Prison Camp Rd, Sanford, NC
Related To This Project
Sanford, NC
--
Sanford, NC
--
Sanford, NC
Bid Date: Jun 12 2025
Sanford, NC
Bid Date: Jun 06 2025
Sanford, NC
Bid Date: Jun 19 2025
Sanford, NC
Bid Date: Jul 14 2025
Sanford, NC
Bid Date: Aug 04 2025
Sanford, NC
--
Sanford, NC
--
Sanford, NC
Bid Date: Jun 03 2025
Sanford, NC
Bid Date: Apr 03 2025
Sanford, NC
--
Sanford, NC
--
Sanford, NC
Bid Date: Mar 25 2025
Sanford, NC
Bid Date: Mar 06 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
