Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.

CDUV Facility Underdrain Improvements Anticipated Contract Start Date: 8/1/2025 Anticipated Contract End Date: 4/28/2026 Questions Due Date: 5/21/2025 (Agency Users may not respond to your question if it is submitted after this date). Requirements: All attendees must complete and submit the attached Temporary Access Form. Please email the completed form a minimum of three days prior to the site visit to jnieves@dep.nyc.gov. Attendees must sign the form and include a CLEAR copy of their drivers license in the lower right corner box of the page. It cannot be a separate attachment, or the police will not accept it. Every attendee must also comply with PPE requirements: Hard Hat, Safety Boots, and Safety Vests.

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

25

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Mass Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fastenings, Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Gratings, Metal Castings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Preservative Wood Treatment, Rough Carpentry, Sheathing, Structural Plastics, Plastic Fabrications
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Portable Lamps, Lamps, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Potable-Water Storage Tanks, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Underground Ducts and Raceways for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Substations, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Special Purpose Lighting, Security Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
236
Bidding Soon
4,815
All Active Projects
2,081
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

October 10, 2025

img_map_placeholder

Multiple Locations, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.