BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Renovation of an educational facility in Stony Brook, New York. Working plans call for the renovation of a educational facility.

https://dec.ny.gov/news/environmental-notice-bulletin/2025-08-06/seqr/town-of-brookhaven-rehab-staller-center-mechanical-electrical-and-plumbing-systems Negative Declaration Suffolk County - The State University Construction Fund, as lead agency, has determined that the proposed Rehab Staller Center Mechanical, Electrical and Plumbing Systems will not have a significant adverse environmental impact. The action involves the rehabilitation of mechanical, electrical, plumbing and HVAC systems along with window replacement and entrances and associated architectural changes necessitated by the exterior closure, HVAC systems and infrastructure work. Site work includes the addition of a replacement chiller and new generator. The project is located at 100 Nicolls Road, in the Town of Brookhaven, New York. Primary Contact Kate Henchey SUCF 353 Broadway Albany, New York 12246 Phone: 518-320-3210 kate.henchey@suny.edu __________________________________________________________________ The State University Construction Fund is seeking statements of qualifications from firms to provide Construction Manager (CM) Agency Services for the Rehabilitate Staller Center Mechanical, Electrical, and Plumbing Systems Music Wing project at the State University of New York at Stony Brook. This Project is for the rehabilitation of the existing Staller Music wing, a 250,000 GSF building, constructed in 1975. The Music Wing includes large rehearsal rooms, music practice rooms, a 5,000 SF art gallery, art studies, classrooms, storage rooms and faculty offices. The Project will replace all mechanical, electrical, plumbing, and fire protection systems, windows, structural work, interior finishes, and the removal of hazardous materials. Submissions should emphasize the firm's significant past experience in providing construction phase CM services for public institutions and institutional clients in a complete and expeditious manner Construction duration from the Notice to Proceed to Substantial Completion of the construction contract is approximately thirty-nine (39) months (thirty-six (36) month construction duration plus three (3) month closeout period) The current estimated construction budget is approximately $89,174,000. Shortlist confirmed

Final Planning

Educational

$89,174,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
4
Bidding Soon
3,387
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

April 7, 2026

Project location map

100 Nicolls Rd, Stony Brook, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.