Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 1, 2025 at 8:00 PM
Updated July 3, 2025
Site work and paving for a mixed-use development in Gainesville, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of June 30, 2025, the project was awarded to RJ GORMAN CONTRACTING LLC, with an awarded amount of $12,901,666.20.** Counties : Alachua, Baker, Bradford, Clay, Columbia, Dist/st-wide, Dixie, Duval, Gilchrist, Hamilton, Lafayette, Levy, Madison, Nassau, Putnam, St Johns, Suwannee, Taylor, Union Road Name: Palatka to Lake Butler Trail Fr Cr 235 to Cr 237 Limits: Midpoint Project(s): 43427615201(*) Federal Aid No: N/A Project(s): 43427715201 Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 630 Total Bridge Length: 0.114 Miles Total Proposal Length: 0.114 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (acq. time) Description: The Improvements Under This Contract Consist of Base Work, Drainage Improvements, Highway Signing, Bridges, Bike Path/trail And Other Incidental Construction for the Palatka to Lake Butler Trail From Cr 235 to Cr 237 in Union & Bradford Counties & Palatka to Lake Butler Trail From Cr 225(Sw 102nd Ave) to Cr 235 in Bradford County. Prequalification Required. Question Deadline 05/14/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 002 - Minor Bridges, Flexible Paving - Districtwide
Award
Roads / Highways
$12,901,666.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 11, 2025
Multiple Locations, Gainesville, FL
Related To This Project
Gainesville, FL
Bid Date: Jun 10 2025
Gainesville, FL
Bid Date: Jun 04 2025
Gainesville, FL
Bid Date: Jun 04 2025
Gainesville, FL
Bid Date: May 15 2025
Gainesville, FL
--
Gainesville, FL
Bid Date: Jun 04 2025
Gainesville, FL
Bid Date: May 21 2025
Gainesville, FL
Bid Date: Jun 04 2025
Gainesville, FL
--
Gainesville, FL
Bid Date: Apr 30 2025
Gainesville, FL
Bid Date: Apr 28 2025
Gainesville, FL
Bid Date: May 07 2025
Gainesville, FL
Bid Date: May 07 2025
Gainesville, FL
Bid Date: May 28 2025
Gainesville, FL
Bid Date: May 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
