BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a civil project in Longview, Washington. Completed plans call for site work for a bridge / tunnel; and road / highway.

Merrill Lake Slide Mitigation Site Directions: The project is located on Road 7654 in Cowlitz County. Latitude N46.0974 and Longitude W122.3123. Any prospective bidder desiring an explanation or interpretation of the solicitation, Drawings, Technical Specifications, or other Contract Documents must make a request to Owner at or before the prebid conference. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders. Est. Completion Date: Oct. 31, 2025 Est. Value: $ 593,000.00 Project Owner Number: DNR 25-E26 The Merrill Lake Slide Mitigation project consists of producing aggregate materials (Quarry Spalls, Crushed Surfacing, and Drainage Aggregate) from a State-Owned quarry (N-3000 Pit) to construct a rock buttress (5000 cy of Quarry Spalls) at the end of the 7634 Forest Road in Cowlitz County. The work also includes improvement of an 1100-foot-long access road to the project site and installing culverts for the roadway. In addition, the work includes clearing and grubbing of the project site followed by excavation of approximately 2900 cy of soil and installation of a perimeter drainage system which includes a Drainage Blanket (350 cy) on the slopes to intercept seepage. The estimated cost of the project is $593,000, and the required substantial completion date is October 31, 2025. The project is located on Road 7654 in Cowlitz County. Latitude N46.0974 and Longitude W122.3123. Pre-Bid Meeting Info: NO REBID CONFERENCE IS SCHEDULED FOR THIS PROJECT.

Under Construction

Roads / Highways

$694,100.00

Public - State/Provincial

Site Work

25

11

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
55
Bidding Soon
1,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

June 17, 2025

Project location map

Road 7654, Longview, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.