BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 13, 2025

Site work for a water / sewer project in Indianola, Iowa. Completed plans call for site work for a water / sewer project.

The City of Indianola is requesting proposals for a new drain system in the Fire Department, 110 N 1st St, Indianola, IA 50125. The scope of work is defined as: Design and install a new drain system with a trench style drain and an interceptor pit for five bays. Use high-strength PSI concrete with a rapid cure solution to allow vehicles to be secured in the garage appropriately. Safely remove and dispose of existing drain components and terminate unused connections. Perform necessary site restoration following installation. Project completion by September 30, 2025. Maintain access for vehicles to park in the bay as much as possible. General questions can be directed to Fire Chief Hurt at 515-962-5257 or ahurt@indianolaiowa.gov. In addition, the following general provisions apply: 1. All work shall be completed in a workman-like manner and in compliance with all building codes and other applicable laws. 2. Contractor shall provide a description of the work to be done and description of materials to be used and the equipment to be used or installed, and the agreed consideration for the work. 3. To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work. 4. Contractor may at its discretion engage sub-contractors to perform work hereunder, provided Contractor shall fully pay said sub-contractor and in all instances remain responsible for the proper completion of the project. 5. Contractor shall furnish appropriate releases or waivers of lien for all work performed or materials provided at the time payment shall be due. 6. All change orders shall be in writing, signed by both parties, and shall be incorporated in, and become part of the agreement. 7. Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of Contractor or its employees or sub-contractors. 8. Contractor shall at its own expense obtain all permits necessary for the work to be performed. 9. Contractor agrees to remove all debris and leave the premises in broom clean condition. 10. Contractor warrants all work for a period of months following completion (Contractor should specify length of warranty).

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
86
Bidding Soon
1,026
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

110 N 1st St, Indianola, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.