BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work and new construction of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the construction of a educational facility; for site work for a educational facility; warehouse / distribution facility; and warehouse / distribution facility.

Saint Paul Public Schools Multiple Sites SPPS Grounds Equipment Storage 2025 Saint Paul, Minnesota Como Park Elementary, 780 Wheelock Parkway West EXPO Elementary, 540 Warwick Street South Journeys Secondary, 90 Western Avenue South Maxfield Elementary, 380 Victoria Street North Washington Technology Magnet School, 1495 Rice Street. Question Deadline 05/02/2025 at 2:00 PM CT Questions and requests for clarifications should be presented in writing to the buyer via the Districts esubmission platform Bid Security in the amount of 5% of the total bid amount (in the form of a bid bond or cashier's check) is required for bids totalling $175,000 or more. Electronically submitted bids require a copy of the bid security to accompany submission. Original cashier's check bid security must be delivered within three (3) business days of bid opening or postmarked on or before bid opening date. The project is five small freestanding storage buildings to hold grounds equipment online. Maxfield Elementary includes additional site work. Each bidder shall review the General Conditions of the Contract, Invitation To Bid Form and Contractor Verification of Compliance forms included in the project manual as noted in 1.5 D above, to verify eligibility for consideration under the criteria established for this project. The Owner intends to recommend award of Contract on June 17 to the Board of Education (BOE). SPPS Purchasing will send Contract to bidder after BOE award and processing is completed. Minnesota Prevailing Wage statutes apply to this Work. Bidder is responsible for obtaining schedule of prevailing wage rates currently in effect and complying with these wage rates. Refer to Section 00 73 40 Prevailing Wage Rates for information and link to current rates. AIA Document A701, 2018 Edition, is hereby made a part of this Project Manual and has been included in its entirety, following this section, for reference. Supplementary Instructions have been edited and inserted into this document. Locations of modifications to the original are indicated in the left margin. The 'Invitation to Bid' Document has been included in its entirety in Section 00 41 00. Bidders must submit completed form. If included document in the Specifications, it is in draft form. An official form will be furnished by the Owner and Architect via Addendum. Responsible Contractor 'Verification and Compliance' Form has been included in its entirety, in Section 00 41 05, following the Invitation to Bid Form. Bidders must submit completed form with the Invitation to Bid Form as required by Minn. Stat 16C.285. Attachments A-1 and A-2 are Supplements to Responsible Contractor 'Verification and Compliance' Form as required by Minn. Stat 16C.285. Forms have been included in their entirety, in Section 00 41 10, following the Invitation to Bid Form. Bidders must submit completed form A-1 with the Invitation to Bid Form as required by the 'Verification and Compliance' form. The provisions and requirements of this document shall apply to all Bidders and Sub-bidders. The Owner shall have the right to reject any or all Bids. A Bid not accompanied by a required bid security or by other data required by the Bidding Documents, or a Bid which is in any way incomplete or irregular is subject to rejection.

Bid Results

Warehouse / Distribution

$623,500.00

Public - City

New Construction, Site Work

52

10

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
161
Bidding Soon
1,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

Multiple Locations, Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.