BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Renovation of an educational facility in Bloomington, Indiana. Completed plans call for the renovation of a educational facility.

Architect Project No - 25-22 The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Women's and Veteran's Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Should a successful Bidder withdraw his bid or fail to execute a satisfactory Contract within 10 days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The Work generally consists of the following: 1. The work consists of the reconfiguration of one(1) men's and one(1) women's group restrooms and one(1) all-gender restroom including the demolition of interior CMU walls, ceilings and flooring and new metalstud wall construction, doors and frames. The finishes include acoustical tile ceilings, ceramic floor and wall tile, paint, plastic laminate casework with solid surface countertops. 2. The electrical work includes demolition of power, and lighting. The new work includes new power, and LED light fixtures. 3. The HVAC work includes demolition of existing equipment, ductwork and GRDs, installation of new equipment, ductwork and GRDs. Installation of new exhaust fans and duct work. 4. The plumbing work includes the removal and replacement of existing fixtures, piping, etc. and the installation of new fixtures, piping, etc. 5. The work includes revisions to sprinkler piping. Each Bidder shall examine the Bidding Documents carefully and, not later than ten (10) days prior to the date of receipt of bids, shall make written request for interpretation or correction of any ambiguity, inconsistency or error therein which it may discover. Verbal questions will not be answered. Request for interpretation, correction or clarification of the Bidding Documents shall be in writing to the Owner's Representative.

Bid Results

Educational

$259,000.00

Public - State/Provincial

Renovation

37

42

5

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
61
Bidding Soon
1,421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

2721 E 10th St, Bloomington, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.