BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated June 12, 2025

Site work and new construction of a municipal facility in Bloomington, Indiana. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; and municipal facility.

Demolition is underway on this project, and there will be a ceremonial groundbreaking on June 3rd, but vertical construction cannot begin until demolition is complete. PREQUAL IS REQUIRED - You must fill out a prequal before bidding this project. Please reach out to Leanna Hamm at lhamm@weddlebros.com for prequal link. PROJECT PROFILE Design and Construction of the expansion of the Bloomington Convention Center in Bloomington, Indiana. Project to include a new Exhibit Hall of approximately 60,000 SF, with Meeting Rooms, Restrooms, Kitchen, Loading Dock, Storage and other support facilities. Project is located between Walnut Street and College Avenue, immediately south of Third Street in Bloomington. Project new construction is required to meet LEED Silver. Project will include a second floor connection over College Avenue to the existing 40,000 SF Convention Center. The second floor connector will be part of the LEED scope and therefore part of this Commissioning. The existing Convention Center will be receiving particular renovations, however the renovation work is not included within this request for proposal. PROJECT TEAM The project team consists of the following: Architect: Schmidt Associates, Inc. LEED Consultant: Schmidt Associates, Inc. MEP Engineer: IMEG Corporation Owners Representative: J.S. Held, LLC Construction Manager: Weddle Bros. Building Group, LLC BIDS ARE RELEASED FOR THIS PROJECT AS FOLLOWS: GMP #1 Released April 7, 2028 BP-02A Earthwork BP-02B Site Utilities To be bid at a later date BP-02E MOT / Site Logistics BP-02F Ground Improvements BP-03A Structural Concrete BP-05 Structural Steel BP-15A Plumbing BP-15B Mechanical BP-15C Fire Protection BP-16 Electrical BP-02C Asphalt BP-02D Landscaping BP-03B Site Concrete BP-04 Masonry BP-06 General Trades BP-07A Facade Systems BP-07B Roofing BP-08 Glazing BP-09A Metal Studs, Drywall, Ceilings BP-09B Painting BP-09C Flooring BP-17 A/V Systems Other packages as required by the final design *The value reflects the overall project and not this particular package.

Post-Bid

Municipal

$71,000,000.00

Public - City

LEED Certification, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
62
Bidding Soon
1,417
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

July 21, 2025

Project location map

302 S College Ave, Bloomington, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.