Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 1, 2025 at 8:00 PM
Updated May 3, 2025
Site work for a water / sewer project in Chicago, Illinois. Completed plans call for site work for a water / sewer project.
A. General Description of Work: Work to be done under this Contract is described in the Project Information found on Book 2 of these specifications. B. Furnishing all Labor, Materials, Equipment, and Transportation Services: Contractor must furnish all labor, materials, proper equipment and machinery, and transportation services necessary to perform and complete, in a workmanlike manner and within the specified time, all Work required under this contract. If overtime or premium labor time is required to perform the Work and/or to comply with permit requirements, the Contractor is solely responsible for the additional labor costs. Additional labor costs shall not be passed onto the Commissioner. C. Project Site: Contractor must maintain the project site and Work area in a clean, orderly and safe manner. D. Coordination: Contractor must coordinate his Work with other contractors, agencies, and utilities as required or directed by the Commissioner. E. Protection of Work: Contractor must provide protection, repair and restoration of all finished Work or property damaged during construction. F. Implied Work: It is the intent of these Specifications to provide the City with improvements to, and ability to maintain, a complete operable water distribution system. Any part or item of Work, which is implied and normally required to make each water main or water service installation satisfactorily and completely operable, is deemed to be included in the Work and Contract price. All miscellaneous appurtenances and other items of Work incidental to meeting the intent of the Contract Documents is also deemed to be included in the Work and Contract price, even though such appurtenances may not be specifically shown or specified. Block Level Lead Service Line Replacement (SBI II) - N. Fairfield - W. Granville Ave. To W. Rosemont Ave. Deadline for Questions: 04:00 PM Central Time, 13-MAR-2025
Post-Bid
Water / Sewer
$5,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2025
June 27, 2025
N Fairfield Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Apr 28 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: May 20 2025
Chicago, IL
Bid Date: May 13 2025
Chicago, IL
Bid Date: May 06 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Apr 25 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
