BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Randolph ES - Interior Renovation Pre-Qualified Contractor Opportunities Deadline to submit Questions Location online portal. Apr 18th 2025, 3:00 PM CDT Overview: The Randolph Elementary School is located southwest of Chicago downtown, off EB I-94. Campus consists of a single 2-story building. The base scope for project includes abating and replacing the existing floor in the Main Gym and the accompanying office/storages areas at the West and East of the Gym area. The existing VCT tiles are Environmentally hazardous in all 3 areas and must be abated/replaced. New flooring will be wood in the Gym and VCT in the two support areas. The new wooden floor in the Gym will receive an app. 6' diameter school logo, to match the existing size. Artwork and location information will be provided to the winning contractor. The existing game markings will be replicated and replaced. Existing vinyl molding at the base of the wall will be removed and replaced. Second through fourth base scope items are removal of existing carpet in classrooms 207, 219 and 209; and replacement with new VCT tiles. The order in which these rooms are listed indicates the priority of that work. If the bid prices are higher than the budget, some of the classroom floor replacement work will be deleted as needed. One alternate is included and requires abatement and replacement of hazardous VCT at 3 stair landings. Refer to next page for a more detailed description of the base scope. Abatement work is required for this project and must be performed under MEC supervision by licensed contractor. Refer to reports and MEC Manual dated 3/17/25 issued by TEM Inc. for those details. All questions/requests must be received in writing by noon on 4/29/2025. Email questions to PM Joti Nagpal (jknagpal@cps.edu). An Addendum, if required will be issued by COB on Wednesday, 4/30/25. Construction is required to be completed during the CPS Summer break 2025. The earliest start date is 6/16/25. Expected construction duration is 7 weeks. The required Preliminary Acceptance date is 8/1/25.

Bid Results

Educational

$302,023.00

Public - City

Renovation

3

14

5

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
261
Bidding Soon
3,359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 16, 2025

Project location map

7316 S Hoyne Ave, Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.