Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
Randolph ES - Interior Renovation Pre-Qualified Contractor Opportunities Deadline to submit Questions Location online portal. Apr 18th 2025, 3:00 PM CDT Overview: The Randolph Elementary School is located southwest of Chicago downtown, off EB I-94. Campus consists of a single 2-story building. The base scope for project includes abating and replacing the existing floor in the Main Gym and the accompanying office/storages areas at the West and East of the Gym area. The existing VCT tiles are Environmentally hazardous in all 3 areas and must be abated/replaced. New flooring will be wood in the Gym and VCT in the two support areas. The new wooden floor in the Gym will receive an app. 6' diameter school logo, to match the existing size. Artwork and location information will be provided to the winning contractor. The existing game markings will be replicated and replaced. Existing vinyl molding at the base of the wall will be removed and replaced. Second through fourth base scope items are removal of existing carpet in classrooms 207, 219 and 209; and replacement with new VCT tiles. The order in which these rooms are listed indicates the priority of that work. If the bid prices are higher than the budget, some of the classroom floor replacement work will be deleted as needed. One alternate is included and requires abatement and replacement of hazardous VCT at 3 stair landings. Refer to next page for a more detailed description of the base scope. Abatement work is required for this project and must be performed under MEC supervision by licensed contractor. Refer to reports and MEC Manual dated 3/17/25 issued by TEM Inc. for those details. All questions/requests must be received in writing by noon on 4/29/2025. Email questions to PM Joti Nagpal (jknagpal@cps.edu). An Addendum, if required will be issued by COB on Wednesday, 4/30/25. Construction is required to be completed during the CPS Summer break 2025. The earliest start date is 6/16/25. Expected construction duration is 7 weeks. The required Preliminary Acceptance date is 8/1/25.
Bid Results
Educational
$302,023.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 16, 2025
7316 S Hoyne Ave, Chicago, IL
Related To This Project
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: May 08 2025
Chicago, IL
Bid Date: Jul 02 2025
Chicago, IL
Bid Date: Jun 02 2025
Chicago, IL
Bid Date: May 21 2025
Chicago, IL
--
Chicago, IL
Bid Date: May 13 2025
Chicago, IL
Bid Date: May 20 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Apr 28 2025
Chicago, IL
Bid Date: Jul 11 2025
Chicago, IL
Bid Date: Apr 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
