BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a road / highway in Tallahassee, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Description: BD-25-610-6101-523 - STT Leonardo Trotman Drive Roadway Construction- Phase 2 on behalf of the Department of Public Works. The proposed liquidated damages which may be assessed for failure to complete the project on time will be included in the Contract for the Project using the schedule of rates in 31 VI R& Regs 242-87. The proposed estimated time to complete this project is 365 calendar days. Request for Information: The information contained herein is believed to be accurate but is not to be considered in any way as a warranty. Request for additional information clarifying the Scope of Services should be directed in writing and submitted via your Online, Last day for request for written clarification will be on at Thursday, April 3, 2025 @ 12:00 noon Atlantic Standard Time. All bids shall contain a specific itemization of all units bid upon and the unit price thereof and shall be submitted in GVIBUY, addressed to the Commissioner of Property and Procurement and, when deemed necessary, shall be accompanied by surety in the form of check, irrevocable letter of credit or bond for five percent (5%) of the bid amount for all construction contracts over $150,000.00. Performance Bond and Payment Bond each are required as follows: Performance Bond: 100% of the Contract Price Payment Bond: 100% of the Contract Price 1. Miscellaneous Surveying, Retaining Wall Construction, Guardrail Installation 2. Site Demo and Retrofit 3. Earthwork 3. Roadway Curbing 4. Bituminous or Reinforced Concrete Paving 5. Signage & Striping 6. Drainage Installation 7. Sewer Installation 8. Erosion Control General Scope of Work Leonardo Trotman Drive 1. Station 0+55 - Station 16+75 - Clearing and Grubbing - Construction Surveying and Staking - Utility Poles Relocation/ Clearance - Retaining Walls - Earthwork - Sewer Installation - Drainage Installation - Pavement Installation - Guardrail Installation - Pavement Marking Installation - Signage Installation Leonardo Trotman Drive 2. Station 17+11.01 - Station 32+39.8 - Clearing and Grubbing - Guardrail Installation - Pavement Marking Installation - Signage Installation Library Drive 3. Station 101+50 - Station 115+90 - Clearing and Grubbing - Guardrail Installation - Pavement Marking Installation - Signage Installation Tutu Mall Pathway 4. Station 50+00 - Station 56+45.31 - Clearing and Grubbing - Electrical Manhole Adjustment - Extend Roadway Connection to Tutu Park Mall Connector - Guardrail Installation - Pavement Marking Installation - Signage Installation

Post-Bid

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

50

23

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
37
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 27, 2025

Project location map

Multiple Locations, Tallahassee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.