BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work for a bridge / tunnel in Spences Bridge, British Columbia. Completed plans call for site work for a bridge / tunnel.

Supply and installation of abutement joint waterproofing compound, haul and install rip rap, supply and install Type D excavation and disposal, removal of high fine surfacing aggregate, haul and placement of 25mm Well Graded Base, production of paving aggregates, asphalt paving, placement of shoulder aggregate, remove, stockpile and reinstall existing precast concrete barriers, remove, dispose and relocate existing signs, install new signs and environmental works. Project Location: The Site is located on Highway 8 approximately 6 km east of the intersection with Highway 1 in Spences Bridge. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

Award

Bridges / Tunnels

$1,631,170.00

Public - State/Provincial

Site Work

17

12

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
1
Bidding Soon
70
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 2, 2025

Project location map

BC-8, Spences Bridge, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.