Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Demolition, site work, remodeling and addition to a playground / park / athletic field in Tyrone, Pennsylvania. Completed plans call for the addition of a playground / park / athletic field; for the demolition of a playground / park / athletic field; for the remodel of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Remodel & Addition to the Railroad Park Facility The Borough of Tyrone reserves the right to reject any and all bids, to waive any informalities or technical defects in such bids, or to award the contract in the best interest of the Borough. If you are a person with a disability and require an auxiliary aid, service or other accommodation to participate in this bid proceeding, please contact the Borough Manager's Office at (814) 684-1330 to discuss how the Borough may best accommodate your needs. All questions during bidding shall be addressed to the Architect and must be submitted in writing. Work included: Comply with procedures described in this Section when applying for progress payment and final payment under the Contract. B. Related Work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 2. The Contract Sum and the schedule for payments are described in the Form of Agreement. 3. Payments upon Substantial Completion and Completion of the Work are described in the General Conditions and in Section 01700 of these Specifications. 4. The Architect's approval of applications for progress payment and final payment may be contingent upon the Architect's approval of status of Project Record Documents as described in Section 01720 of these Specifications. Work included: This Section establishes general requirements pertaining to cutting (including excavating), fitting, and patching of the Work required to: 1. Make the several parts fit properly; 2. Uncover work to provide for installing, inspecting, or both, of ill-timed work; 3. Remove and replace work not conforming to requirements of the Contract Documents; and 4. Remove and replace defective work. B. Related Work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions and Sections in Division 1 of these Specifications. 2. In addition to other requirements specified, upon the Architect's request uncover work to provide for inspection by the Architect of covered work, and remove samples of installed materials for testing. 3. Do not cut or alter work performed under separate contracts without the Architect's written permission.

Under Construction

Playgrounds / Parks / Athletic Fields

$219,000.00

Public - City

Addition, Demolition, Remodeling, Site Work

13

18

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
84
Bidding Soon
967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

850 Pennsylvania Ave, Tyrone, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.