BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Renovation of an educational facility in Memphis, Tennessee. Completed plans call for the renovation of a educational facility.

The Shelby County Board of Education will accept written bids for: Fairley HS Gym Floor & Bleachers Questions or requests for clarification of technical issues and terms pertaining to this Bid must be submitted in writing via e-mail to LaKesia Rivers at riversl1@scsk12.org by April 25, 2025 @ 10:00 AM CST The Scope of Work for the Central HS Reinforced Concrete, Masonry & Brick Facade Repairs project shall include and not be limited to the following: Fairley High School Gym Floor Replacement: o Demolition and replacement of existing varsity gymnasium maple wood floor. o Demolition of all VCT floor surrounding and touching wood floor and replace with wood floor throughout gym area. o Installation of a new MFMA 2 nd grade or better maple floor system with a complete and functioning system. o Replacement of all existing game lines and logos, including all other sports items. o Replace logo in 12' jump circle with new logo to be sent from MSCS o Installation of a new 6 mil polyethylene vapor barrier. (vapor barrier must meet staygo standards) o Removal of existing perimeter wood floor cove base in all cases. o Installation of new maple wood floor perimeter venter cove base to match existing. (must do mock-up for approval) o Removal of existing door thresholds and replacement of door thresholds, including walk-off mats at exterior doors and rubber/vinyl mats at interior doors. o All exterior doors must be waterproof around all opening frames. o Provide new aluminum transition strips through existing door and cased openings Match thickness and size of existing. (Zinc strip) o New hinged brass cover plates shall be installed to cover existing volleyball inserts. Prep gym floor to receive new volleyball sleeves. Size shall match existing o Refinish new maple wood floor per MFMA standards for complete and functioning system. o Replacement of HVAC system filters upon completion of project. Must maintain correct humidity levels during construction. o Readjust new floor to regulation height. All basketball goals must match new flooring. o New floor striping shall meet TSSAA guidelines in all cases. o Readjust basketball goals to regulation height o Replacement of all power/outlets/low voltage/connections on the court. o Attic stock for maintenance cleaners and complete closeouts. o Flatness/test/control moisture levels prior to removal of new floor in all cases. Levels of control would be: o Floor flatness o Moisture readings in slab on grade o Sleeper installs o Moisture testing of air quality and floor moisture o Contractor is responsible for all or any water intrusion for complete and functioning system in all cases. Fairley High School Bleachers Replacement: o Shop drawings are required for bleachers and gym floors o Motorized Retractable Gym Bleachers with 10 rows of seating made from high density polyethylene (HDPE) with two remote controllers required. o Demolition of existing bleachers and prepared for storage. o Transporting existing bleachers which will include loading and unloading to 1364 Farmville Rd. warehouse to be included in price. o Installation of new motorized retractable plastic gym bleachers must meet all local & state code requirements to complete a functioning system. o Bleacher seats color will be black. o Professional installation requires to ensure proper alignment and structural integrity and compliance with safety regulations. o Site preparation will ensure where the bleachers are installed is level and suitable foundation to support weight of bleachers when fully extended and to protect existing conditions. o Properly lubricate all moving parts like wheel, tracks and drive mechanism to maintain a smooth operation and prevent excessive ware. o Proper training for all operators. o Must follow latest MSCS Design Guidelines

Bid Results

Educational

$440,000.00

Public - County

Renovation

7

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
1
Bidding Soon
430
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

July 15, 2025

Project location map

4950 Fairley Rd, Memphis, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.